Yiribana Logistics Estate
Where it is in the process
Approved on 22 Sep 2023
What it proposes
The department's description
Concept plan and Stage 1 DA for an industrial estate. Stage 1 comprises two warehouses, site-wide bulk earthworks and retaining walls, an internal road network, storm water works, car parking, signage and landscaping.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
5 submissions: 1 from the public, 3 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
3 changes to the project after its decision, each assessed as a case of its own, newest first.
Yiribana Logistics Estate MOD 3 - Warehouse 3 Design ChangesSSD-10272349-Mod-3
Modifications to the design of Warehouse 3 to accommodate changes to the approved internal layout, built form, loading dock and driveway arrangements to meet tenant operational requirements, including introduction of a click-and-collect operation.
Its 20 documents
20 documents in 5 folders, each on the NSW Planning Portal
Modification Application11
Agency Advice2
Additional Information4
Determination2
Consolidated Consent1
Yiribana Logistics Estate MOD 2 – Civil Works AmendmentsSSD-10272349-Mod-2
The modification proposes changes to the estate road layout, additional bulk earthworks, and revised stormwater infrastructure and retaining walls, without changing the approved land use, warehouse layout, gross floor area or parking.
Its 21 documents
21 documents in 3 folders, each on the NSW Planning Portal
Modification Application15
Agency Advice5
Additional Information1
Yiribana Estate (GPT) MOD 1 - Retaining WallSSD-10272349-Mod-1
The purpose of this Modification Application (Mod 1) is to amend the proposal with respect to a minor change associated with the location of a retaining wall (Retaining Wall 2) which flanks the northern boundary of Lot 2.
Its 16 documents
16 documents in 5 folders, each on the NSW Planning Portal
Modification Application5
Agency Advice3
Additional Information5
Determination2
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
241 documents in 13 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
EIS68
- Application_20210908062910
- EIS Appendix A - SEARs Reference Table
- EIS Appendix AA - Groundwater Management Plan
- EIS Appendix B - Mandatory Considerations Table
- EIS Appendix BB - Preliminary Site Investigation
- EIS Appendix C - Community Engagement Table
- EIS Appendix CC - Remedial Action Plan
- EIS Appendix D - Mitigation Measures
- EIS Appendix DD - Potential Acid Sulphate Soil Advice
- EIS Appendix E - Draft Mamre Road DCP Compliance Table
- EIS Appendix EE - Hazards Analysis
- EIS Appendix F - Capital Investment Value (CIV)
- EIS Appendix FF - Waste Management Plan
- EIS Appendix G - Concept Architectural Plans
- EIS Appendix G - Stage 1 Architectural Plans
- EIS Appendix GG - Aeronautical Impact Assessment
- EIS Appendix H - Design Statement
- EIS Appendix HH - ESD and Greenhou
- EIS Appendix I - Landscape Masterplan
- EIS Appendix II - Noise and Vibration Assessment
- EIS Appendix J - Urban Design and VIA Report
- EIS Appendix JJ - Air Quality Impact Assessment
- EIS Appendix K - Civil Drawings
- EIS Appendix KK - Bushfire Assessment Report
- EIS Appendix L - Attachment A-C
- EIS Appendix L - Attachment D-E1
- EIS Appendix L - Attachment E2
- EIS Appendix L - Attachment E2.1
- EIS Appendix L - Attachment E2.2
- EIS Appendix L - Attachment E2.3
- EIS Appendix L - Attachment E2.4
- EIS Appendix L - Attachment E2.5
- EIS Appendix L - Attachment E2.6
- EIS Appendix L - Attachment E2.7
- EIS Appendix L - Attachment E2.8
- EIS Appendix L - Attachment F-G
- EIS Appendix L - Civil Engineering & WCM Strategy
- EIS Appendix LL - BCA Assessment Report
- EIS Appendix M - Site Survey Plan
- EIS Appendix MM - Fire Safety Strategy
- EIS Appendix N - Stakeholder Participation Strat
- EIS Appendix NN - Flood Modelling_Pt1
- EIS Appendix NN - Flood Modelling_Pt10
- EIS Appendix NN - Flood Modelling_Pt11
- EIS Appendix NN - Flood Modelling_Pt12
- EIS Appendix NN - Flood Modelling_Pt13
- EIS Appendix NN - Flood Modelling_Pt14
- EIS Appendix NN - Flood Modelling_Pt2
- EIS Appendix NN - Flood Modelling_Pt3
- EIS Appendix NN - Flood Modelling_Pt4
- EIS Appendix NN - Flood Modelling_Pt5
- EIS Appendix NN - Flood Modelling_Pt6
- EIS Appendix NN - Flood Modelling_Pt7
- EIS Appendix NN - Flood Modelling_Pt8
- EIS Appendix NN - Flood Modelling_Pt9
- EIS Appendix O - Community Fact Sheet
- EIS Appendix P - Consultation Outcomes Report
- EIS Appendix Q - Social Impact Assessment
- EIS Appendix R - BDAR
- EIS Appendix S - Riparian Lands Assessment
- EIS Appendix T - Vegetation Management Plan
- EIS Appendix U - ACHAR_Redacted
- EIS Appendix V - Transport and Accessibility Plan
- EIS Appendix W - Heritage Impact Statement
- EIS Appendix X - Service Infrastructure Report
- EIS Appendix Y - Geotechnical Investigation
- EIS Appendix Z - Imported Fill Protocol
- EIS Main Report
Response to Submissions31
- 11-04-2022 - RFI - Construction traffic
- 22-10-2021 - Request RTS
- Appendix A - Revised Architectural Drawings 1
- Appendix A - Revised Architectural Drawings 2
- Appendix B - MRP DCP Compliance Table
- Appendix C - Warehouse 3 Shadow Diagram
- Appendix D - Revised Stage 1 Landscape Plans
- Appendix E - Revised Estate Landscape Plans
- Appendix F - Revised Warehouse 1 Landscape Plans
- Appendix G - Revised Warehouse 3 Landscape Plans
- Appendix H - Revised Civil Engineering Drawing 1
- Appendix H - Revised Civil Engineering Drawing 2
- Appendix I - Revised Flood Assessment
- Appendix J - Revised Civil Engineering and WCM Strategy
- Appendix K - Revised MUSIC Modelling
- Appendix L - Revised Drainage Modelling
- Appendix M - Crime Risk Assessment
- Appendix N - Revised Weed Eradication and Management Plan
- Appendix O - Revised Riparian Lands Assessment
- Appendix P - Revised Vegetation Management Plan
- Appendix Q - Revised Noise and Vibration Impact Assessment
- Appendix R_Revised Transport and Accessibility Plan
- Appendix S_Revised Fire Safety Strategy
- Appendix T_BCA Assessment
- Appendix U_NRAR Correspondence
- Appendix V_Evidence of consultation
- Appendix W_Response to IDC Review
- Appendix X_Section 37 Request to Amend SSD-10272349
- Appendix Y_Functional Layout Plan Temporary Access Road
- Request RTS - DPIE comments
- SSD-10272349 - Submissions Report
Agency Advice35
- 1. Council Advice on SEARs - 6 November 2020
- 1. DPIE Central (Western) Team - UD Comments Advice on SEARs - 12 November 2020
- 1. DPIE Water Group Advice on SEARs - 27 October 2020
- 1. EES Advice on SEARs - 28 October 2020
- 1. EPA Advice on SEARs - 29 October 2020
- 1. HCNSW Advice on SEARs - 30 October 2020
- 1. HNSW ACH Advice on SEARs - 12 November 2020
- 1. Sydney Water Advice on SEARs - 12 November 2020
- 1. TfNSW Advice on SEARs - 6 November 2020
- 2. Council -Advice on EIS - October 2021
- 2. DPIE Central (Western) Team Advice on SEARs - 12 November 2020
- 2. EES advice on EIS - 29 October 2021
- 2. EPA advice on EIS - 28 October 2021
- 2. Heritage NSW (ACH) Advice on EIS - 19 October 2021
- 2. Heritage NSW Advice on EIS - 14 October 2021
- 2. Sydney Water advice of EIS - 21 December 2021
- 2. TfNSW - Advice on EIS - 22 October 2021
- 2.DPIE Water advice on EIS - 18 November 2021
- 3. Council - Advice on RTS
- 3. DPE Water - advice on RTS
- 3. EHG Advice on RTS
- 3. Sydney Water - advice on RTS
- 3. TFNSW - Advice on RTS November 2022
- 4. Council - Advice on supp info March 2023
- 4. EHG - advice on supp info April 2023
- 4. SWC - Advice on consolidated info
- 4. TfNSW final advice
- 5. Council - advice on consolidated info
- 5. EHG - Advice on consolidated info
- 6. EHG Response 28.7.2023
- DPI Agriculture Advice on SEARs - 22 October 2020
- Endeavour Energy Advice on SEARs - 12 November 2020
- RFS advice on application
- WSPP Advice on SEARs - 12 November 2020
- WaterNSW Advice on EIS - 18 October 2021
Amendments2
Additional Information47
- Appendix A_Updated Architectural Drawings
- Appendix B_Updated Civil Package_Authority Consultation
- Appendix B_Updated Civil Package_Civil Drawings (1)
- Appendix B_Updated Civil Package_Civil Drawings (2)
- Appendix B_Updated Civil Package_Civil Report
- Appendix B_Updated Civil Package_Civil Response
- Appendix B_Updated Civil Package_DRAINS Model
- Appendix B_Updated Civil Package_Flood Drawings (1)
- Appendix B_Updated Civil Package_Flood Drawings (2)
- Appendix B_Updated Civil Package_Flood Drawings (3)
- Appendix B_Updated Civil Package_Flood Drawings (4)
- Appendix B_Updated Civil Package_Flood Drawings (5)
- Appendix B_Updated Civil Package_Flood Drawings (6)
- Appendix B_Updated Civil Package_Flood Drawings (7)
- Appendix B_Updated Civil Package_Flood Drawings (8)
- Appendix B_Updated Civil Package_Flood Drawings (9)
- Appendix B_Updated Civil Package_MUSIC Model
- Appendix B_Updated Civil Package_Topography
- Appendix C_Updated Transport Assessment_Report
- Appendix C_Updated Transport Assessment_Supporting Info
- Appendix D_Updated Landscape Plan_Detailed Drawings
- Appendix D_Updated Landscape Plan_Master Plan
- Appendix E_Updated Bush Fire Assessment Report
- Appendix F_Updated Vegetation Management Plan
- Appendix G_Updated Riparian Lands Assessment
- Appendix H_Evidence of Engagement with Landowners
- Appendix I_Updated Noise Report
- Appendix J_Concept Freight Access Road
- Appendix J_Concept Freight Access Road_CAD Drawing
- Appendix K_BDAR (1)
- Appendix K_BDAR (2)
- Appendix K_BDAR_Shapefiles
- Appendix L_MRP DCP Compliance Table (May 2023)
- Appendix M_Lot Plan
- Appendix N_Joint North South Road Plan
- Appendix O_Updated Service Infrastructure Report
- Appendix P_Updated Mitigation Measures Table
- Attachment 1 - DPE RFI October 2022
- Attachment 1 - agency advice on RTS
- Attachment 2 - IDC comments
- DPE Request for Additional Information
- GPT YLE_RFI Supplementary Report
- Request for Additional Information - 13 October 2022
- Request for Additional Information - 20 October 2022
- Request for Additional Information - 25 Nov 2022
- Request for Additional Information - March 2023
- Request for Additional Information - Noise May 2023
Determination3
Management Plans and Strategies38
- 1266-SVR-01-201123.v1f
- 20240606 RWDI 2105533 REP Noise YiribanaEastCNVMP
- 22004. GPT-ESCP-2-240905
- 23.1073.FR1V3
- Approval of Condition B10 – Extension
- Approval of Plan Strategy or Study
- Approval of Plan Strategy or Study
- Approval of Plan Strategy or Study
- Approval of Plan Strategy or Study
- Approval of Plan Strategy or Study
- Approval of Plan Strategy or Study
- Approval of Staging Plan extension May 2025
- Approval of revised ESCP
- CEMP 10.07.2024 rev3
- CTMP_Yiribana Logistics Estate Issue VI
- Co13874.06-24d.rpt_Appendix A1
- Co13874.06-24d.rpt_Appendix A2
- Co13874.06-24d.rpt_Appendix B1
- Co13874.06-24d.rpt_Appendix B2 (p1-10)
- Co13874.06-24d.rpt_Appendix B2 (p11-21)
- Co13874.06-24d.rpt_Appendix B2 (p22-31)
- Co13874.06-24d.rpt_Appendix B2 (p32-42)
- Co13874.06-24d.rpt_Appendix B2 (p43-54)
- Co13874.06-24d.rpt_Appendix B2 (p55-62)
- Co13874.06-24d.rpt_Appendix C
- Co13874.06-24d.rpt_Appendix D
- Co13874.06-24d.rpt_Appendix E
- Co13874.06-24d.rpt_Appendix F
- Co13874.06-24d.rpt_Report Only
- Condition B28 and B31 - SMS and Trunk Drainage Approval
- Dam Decommissioning Plan 19200RP4_FINAL v2
- Erosion and Sediment Control Plan Rev 2.0
- Extension of Time Condition B10
- GPT Yiribana SSD-10272349_Signage Strategy_Final
- Yirabana CEMP Endorsement Letter 22_01_24 (Rev 1)
- Yiribana East Logistics Estate Signage Strategy_
- Yiribana Logisitics Signage Estate
- _231201_Landscape+Drawings_SS21-4623_000-601_
Notifications6
Other Documents2
What's near it
Where it is
- Suburb
- Kemps Creek
- Council area
- Penrith
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.