Aspect Industrial Estate Stage 4 Development (Warehouse 8)
Where it is in the process
Approved on 11 Oct 2024
What it proposes
The department's description
Construction and operation of a warehouse and distribution centre.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
10 submissions: 3 from organisations and 7 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
3 changes to the project after its decision, each assessed as a case of its own, newest first.
Aspect Industrial Estate Stage 4 (WH8) - Modification 3SSD-60513208-Mod-3
Modify the cumulative stormwater management strategy to align with the Water Management Strategy that has been established for the EEP Stage 1A SSDA.
Its 9 documents
9 documents in 3 folders, each on the NSW Planning Portal
Modification Application6
Consolidated Consent1
AIE Warehouse 8 MOD 2 - Layout ChangesSSD-60513208-Mod-2
Modification to the Stage 4 Detailed Development, including amendments to Warehouse 8 layout.
Its 36 documents
36 documents in 5 folders, each on the NSW Planning Portal
Modification Application18
- Appendix A_Updated Project Description
- Appendix B_Consolidated Mitigation Measures
- Appendix C_Statutory Compliance Table
- Appendix D_Architectural Drawings
- Appendix E_Landscape Plans
- Appendix F_Tree Canopy Plan
- Appendix G_Civil Plans
- Appendix H_Traffic Statement
- Appendix I_Noise and Vibration Report
- Appendix J_Air Quality Assessment
- Appendix K_BCA Assessment Report
- Appendix L_Fire Safety Report
- Appendix N_ESD Report
- Appendix O_Civil Report
- Appendix P_EDC Report
- Appendix Q_Landscape Masterplan
- MUSIC Model Lot 8
- Modification Report_SSD10448 MOD 9 & WH8 MOD 2
Agency Advice5
Additional Information10
- AR-AIE.B08.DA.2020-SBAA(H)
- AR-AIE.B08.DA.2090-SBAA(G)
- Attachment A_Updated Arch Drawings_Elevation_29.04.2025
- RTS - Attachment A Arch. Drawings - March 2025
- RTS - Attachment B Landscape Plans - March 2025
- RTS - Attachment C Tree Canopy Plan
- RTS - Attachment D Civil Drawings - March 2025
- RTS - WH8 RFI Response Letter
- Request for Additional Informaiton
- SSD-10448_MOD9 & SSD-60513208 MOD 2 RFI Response_29.04.2025
Determination2
Consolidated Consent1
AIE Warehouse 8 MOD 1 - Stormwater ChangesSSD-60513208-Mod-1
Removal of 5 hectares of land within the EEP Site from the cumulative stormwater management strategy approved under the AIE Concept Plan Approval.
Its 15 documents
15 documents in 4 folders, each on the NSW Planning Portal
Modification Application8
- Appendix A - Updated Project Description
- Appendix B - Plans for Approval
- Appendix C - Statutory Compliance Table
- Appendix D - Mitigation Measures Table
- Appendix H - WH8 MOD1 - Civil Report
- Mod Report_SSD-10448 MOD8 & Subsequent Stage SSDs
- Music Model and Flow Duration Curve_WH8 MOD1
- Stage 4 - WH8 - REVISED SMP - March 2025
Agency Advice4
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
133 documents in 12 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs6
EIS28
- Appendix A - SEARs Compliance Table
- Appendix AA Dangerous Goods Assessment (Warehouse 8A)
- Appendix BB Dangerous Goods Assessment (Warehouse 8B)
- Appendix D - Community Engagement Table
- Appendix E - Updated Mitigation Measures
- Appendix EE Tree Canopy Plan
- Appendix F3 Architectural Drawings - Updated Landscape Plan
- Appendix FF EV Battery Storage Risk Assessment
- Appendix GG Civil Plans
- Appendix I Traffic Statement
- Appendix J Noise and Vibration Assessment
- Appendix L ESD Report
- Appendix M BCA Assessment Report
- Appendix N1 Fire Strategy Report - Warehouse 8
- Appendix O Social Impact Assessment Addendum
- Appendix P Civil Report
- Appendix Q Waste Management Plan
- Appendix R Cost Summary Report - Warehouse 8A 8B
- Appendix S BDAR Waiver
- Appendix T Groundwater Management Plan
- Appendix U Flood Risk Assessment
- Appendix V Remediation Action Plan
- Appendix W Erosion and Sediment Control Plan
- Appendix X Heritage Consistency Letter
- Appendix Y Bushfire Report
- Appendix Z Geotechnical Assessment
- Application_20231127055923
- Warehouse 8_Embodied Emissions Materials Form (NSW SEPP)
Response to Submissions27
- 24-01-24 - Request RTS Letter
- 24-02-02 - Department Comments on the EIS
- Amendment Acceptance Letter
- Amendment Report MOD 6 and Warehouse 8
- Appendix AA Dangerous Goods Assessment (Warehouse 8)
- Appendix B - Updated Project Description
- Appendix C - Statutory Compliance Table
- Appendix CC Detailed Site Investigation
- Appendix E - Updated Mitigation Measures
- Appendix EE Tree Canopy Plan
- Appendix F1 Architectural Drawings Warehouse 8
- Appendix G2 Landscape Plans - Masterplan
- Appendix H1 - Visual Impact Assessment - Report
- Appendix J Noise and Vibration Assessment
- Appendix K Air Quality Impact Assessment
- Appendix L ESD Report
- Appendix N1 Fire Strategy Report - Warehouse 8
- Appendix O - Social Impact Assessment Addendum
- Appendix Q Waste Management Plan
- Appendix S BDAR Waiver
- Appendix T Groundwater Management Plan
- Appendix U Flood Risk Assessment
- Appendix V Remediation Action Plan
- Appendix X Heritage Consistency Letter
- Appendix Y Bushfire Report
- Appendix Z Geotechnical Assessment
- Response to Submissions Report
Agency Advice11
- Advice on Assessment - BCS
- Advice on Assessment - BCS Flooding
- Advice on RTS - Biodiversity and Conservation
- Advice on RTS - FRNSW
- Advice on RTS - Penrith Council
- Advice on RTS - Sydney Water
- SEARs Advice - Environment and Heritage Group DPE
- SEARs Advice - Penrith City Council
- SEARs Advice - Sydney Water
- SEARs Advice - Water Group DPE
- TfNSW Concurrence Ltr 11 Oct 2024
Additional Information14
- Att A - Architectural Drawings W 8 31.07.24
- Att B - Updated Landscape Plans 31.07.24
- Att C - Updated BDAR Waiver - Warehouse 8 07.08.24
- Att Di - Civil Infrastructure Report 13.08.24
- Att Dii - Updated MUSIC Model__MOD4 Stage 4
- Att Diii - Flow Duration Curve - Stage 4 (W8)
- Att Ei - Letter Response ESCP_13.08.2024
- Att Eii - Updated ESCP Plans_13.08.2024
- Att F - NABERS Agreement to Rate
- BDAR waiver determination
- RFI Attachment A - Govt Agency Advice
- RFI Response Letter WH8_14 August 2024
- RFI on Amendment Report 19 July 2024
- SSD 60513208 RFI Transport 120624
Management Plans and Strategies30
- 24-12-02 - Approval of Warehouse 8 CEMP
- 24-12-02 - Approval of Warehouse 8 CEMP
- 24-12-02 - Approval of Warehouse 8 CEMP
- 24-12-02 - Approval of Warehouse 8 CEMP
- 24-12-02 - Approval of Warehouse 8 CEMP
- 24-12-02 - Approval of Warehouse 8 CEMP
- 24-12-02 - Warehouse 8 FERP Approval
- 24-12-12 - Approval of AIE Stage 4 Landscape Plan
- 241108_ER Endorsement Letter
- 241108_ER Endorsement Letter
- 241108_ER Endorsement Letter
- 241108_ER Endorsement Letter
- 241108_ER Endorsement Letter
- 241108_ER Endorsement Letter
- AIE Warehouse 8 CEMP
- Appendix D - CTMP
- Appendix E - ESCP
- Appendix F - CNVMP
- Appendix G - CAQMP
- Appendix H - CCCHS
- Approval of Plan Strategy or Study
- Attachment A_Mirvac WH8 Estate Signage
- Attachment B_Lot 8 Elevations
- ER Review and Close-out letter
- FERP Warehouse 8
- Final Signage Strategy - AIE WH8 SSD-60513208
- Landscape Plan
- Mirvac-AIE-WH8-OEMP-20250827_v0.2 _Packaged (1)
- OEMP Approval Letter
- Warehouse 8 Landscape Plan
Notifications3
Other Documents8
- 24-11-07 - Appointment of CPESC Expert
- 24-11-07 - Approval of Establishing MRP Working Group
- 24-11-07 - Endorsement of ER
- AIE - SSD-60513208 - CPESC Nomination Letter
- AIE - SSD-60513208 - ER Nomination Letter
- AIE - SSD-60513208 - MRPWG Letter
- WH8 - CC1 Wall Disclosure Statement_Rev A
- Warehouse 8 Dilapidation report
What's near it
Its point is approximate (the register's own, to about a kilometre), and so are these.
Where it is
- Suburb
- Kemps Creek
- Council area
- Penrith
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.