AI summary. Written from this project's page and its SSD-30871587 Assessment Report and SSD-30871587 Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Two warehouses at 805-817 Mamre Road, Kemps Creek
The project is a warehouse and distribution centre at 805-817 Mamre Road, Kemps Creek, in the Penrith local government area. It includes bulk earthworks, an eight-lot subdivision and two warehouses with offices, 101 car spaces and landscaping, on a site of 20.83 ha. The warehouses have a total floor area of 21,091 m² and are up to 14.6 m high. The department gives a capital investment of $54,783,000, with 220 construction jobs and 370 operational jobs.
The environmental impact statement (EIS) was exhibited from 14 Nov 2023 to 11 Dec 2023. It drew 3 submissions, all comments, from organisations and a public authority. The department's assessment recommended approval. A director of the department, acting for the Minister, approved the project on 11 Dec 2025, with conditions. Next, the proponent must meet those conditions, including a planning agreement with the council, before building and operating.
- Capital investment
- $54.8MSSD-30871587 Assessment Report
- Construction jobs
- 220 jobsSSD-30871587 Assessment Report
- Operational jobs
- 370 jobsSSD-30871587 Assessment Report
- Total gross floor area
- 21,091 m²SSD-30871587 Assessment Report
- Maximum building height
- 14.6 mSSD-30871587 Assessment Report
- Site area
- 20.83 haSSD-30871587 Assessment Report
- Car spaces
- 101 car spacesSSD-30871587 Assessment Report
- Lots in the subdivision
- 8 lotsSSD-30871587 Assessment Report
The department's description
Demolition and bulk earthworks, construction of a warehouse and distribution centre across two lots, car parking and landscaping, an internal road and a temporary access road on the boundary between 799-803 and 805-817 Mamre Road
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
3 submissions: 2 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
805-817 Mamre Road MOD 1 - Revised Interim Access ArrangementSSD-30871587-Mod-1
Removal of the approved interim access road and associated Mamre Road widening works, with continued use of the temporary construction access road until connection to the ultimate road network is available
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
173 documents in 9 folders, each on the NSW Planning Portal
Notice of Exhibition1
SEARs3
EIS34
- AA - Environmental Contamination Investigation
- BB - Preliminary and Detailed Site Investigation
- CC - Soil Salinity Investigation
- D - MRDCP Compliance Table
- DD - Bushfire Assessment
- E - IE SEPP Signage Assessment
- EE - Fire Engineering Letter
- Environmental Impact Statement - Rev H
- F - Consultation Emails
- FF - Proposed Plan of Subdivision
- G - Architectural Plans
- GG - Survey Report
- H - Architectural Design Statement
- HH - BCA Assessment
- I - Civil Engineering Plans
- J - Civil Engineering Report
- K - MUSIC Model and DRAINS Model
- L - Water Cycle Management Strategy
- M - Erosion and Sediment Control Plan
- N - ACHAR_Redacted
- O - Watercourse and Biodiversity Assessment
- P - Social and Economic Impact Assessment
- Q - Electrical Connection Concept Design
- Q - Electrical Connection Design Certification
- QS Report 12 October 2023
- R - Landscape Plans
- S - Visual Impact Assessment Report
- T - Transport Management and Accessibility Plan
- U - Environmentally Sustainable Design Strategy
- V - Greenhouse Gas Emissions and Energy Efficiency Report
- W - Air Quality Impact Assessment
- X - Noise Impact Assessment
- Y - Waste Management Plan
- Z - Flood Impact Risk Assessment
Response to Submissions38
- 2210384_805-817 Mamre Road_RTS Report_RevH
- A - Revised Architectural Drawings Package
- Appendix AA - Proposed Subdivision Plans
- Appendix BB - Addendum Geotechnical Letter
- Appendix CC - Updated Geotechnical Report
- B - Revised Landscape Drawings
- C - Civil Works Package
- D - Landscape and Visual Impact RTS Letter
- DD - Updated ACHAR
- E - Revised Watercourse and Biodiversity Assessment
- EE - TMAP Addendum Letter
- F - Revised Noise Impact Assessment
- FF - Addendum Contamination Letter
- G - Consultation with adjoining landowners
- GG - Updated BCA Assessment Report
- H - Lighting Concept Design Report
- HH - Drainage Culvert Extension Plans
- I - Mamre Road DCP Compliance Table
- II - Temporary Construction Access
- J - Response to DPHI Traffic RTS Letter
- K - Mamre Road Widening Concept Design
- L - Models
- L - Water and Stormwater Management Plan
- M - Soil Salinity Investigation
- N - Updated Flood Impact Risk Assessment Report
- O - Site Survey Plan
- P - Revised Air Quality Assessment
- Q - Civil Design Report
- R - Erosion and Sediment Control Plan
- S - New AHIMS Search
- SSD-30871587 RTS request letter 121223
- T - Evidence of Correspondence with Heritage NSW
- U - Evidence of Registration of PAD
- V - Signage Compliance Table
- W - Aerotropolis Precinct Plan Compliance Table
- X - Aerotropolis Development Control Plan Compliance Table
- Y - Architectural Design Statement
- Z - Land Dedication Plans
Agency Advice26
- Add Info RFI_Advice_PCC
- Add Info RFI_Advice_SW
- Additional Info Advice_CPHR
- Additional Info Advice_DCCEEW Water Group
- Additional Info Advice_HNSW ACH
- Additional Info Advice_PCC
- Additional Info Advice_SW_Combined
- Additional Info Advice_TfNSW
- EIS Advice - DPE Water
- EIS Advice - DPI Fisheries
- EIS Advice - EHG
- EIS Advice - FRNSW
- EIS Advice - HNSW
- EIS Advice - PCC
- EIS Advice - RFS
- EIS Advice - TfNSW
- EIS Advice - WPCA
- EIS Advice - WSA
- EIS Advice- Sydney Water
- RTS Advice-CPHR
- RTS Advice-DCCEEW Water Group
- RTS Advice-HNSW
- RTS Advice-PCC
- RTS Advice-Sydney Water_Combined
- RTS Advice-TfNSW
- RTS Advice-WSIA_Redacted
Additional Information50
- Add Info RFI A - Updated Architectural Plans_2
- Add Info RFI B - Updated Design Statement_1
- Add Info RFI C - CTMP (Updated)_1
- Add Info RFI D - BDAR Waiver_1
- Add Info RFI E - Updated VPA Subdivision Plans_1
- Add Info RFI E - VPA Civil Plans_1
- Add Info RFI E - VPA NDA Plans_1
- Add Info RFI F - Sydney Water Responses_1
- Add Info RFI G - Updated Civil Plans_1
- Add Info RFI H - Updated WSMP_1
- Add Info RFI I - Updated Landscape Plans_1
- Add Info RFI J - Updated Temporary Access Plans_1
- Add info RFI-Response_RevB_1
- Oct 25_Add Info_ESCP Package
- Oct 25_Add Info_Endorsement letter_Sydney Water
- Oct 25_Add Info_Stormwater Modelling
- Oct 25_Add Info_Technical
- Oct 25_Add Info_Updated Civil Package
- Oct 25_Add Info_Updated WSMP
- RTS Resp_Att A_Updated Flood Risk Assessment
- RTS Resp_Att B_Updated Architectural Plans
- RTS Resp_Att C_Updated Arch Design Stmt
- RTS Resp_Att D_Updated AQIA
- RTS Resp_Att E_CTMP
- RTS Resp_Att F_Updated Civil Drawings
- RTS Resp_Att F_Updated Civil Report
- RTS Resp_Att F_Updated ESCP
- RTS Resp_Att F_Updated WSMP
- RTS Resp_Att G_Addendum Hydrogeological Assessment
- RTS Resp_Att H_Revised BDAR Waiver Request
- RTS Resp_Att I1_Updated ACHAR
- RTS Resp_Att I2_Updated ACHAR Consultation
- RTS Resp_Att I5_Updated ACHAR DD Appendix
- RTS Resp_Att I6_Updated ACHAR ATER
- RTS Resp_Att K_Sydney Water AT&L Responses
- RTS Resp_Attt J_Transport Mgmt & Access Plan Plan
- RTS Resp_new updated landscaping plans_04.07.25
- RTS Response_Final_July 2025
- Request for Additional Information
- Request for Additional Information
- Request for Additional Information
- Request for Additional Information
- Request for Additional Information_Signage
- Sept 25_Add Info AttA_Updated W2 West Elevation
- Sept 25_Add Info AttB_Updated NIA
- Sept 25_Add Info AttC_UPDATED AQIA
- Sept 25_Add Info AttD_Updated Civil Works Package
- Sept 25_Add Info AttE_Updated Civil Design Report
- Sept 25_Add Info AttF_Updated WSMP
- Sept 25_RFI Response Cover Letter
Management Plans and Strategies16
- 817 Mamre Road CEMP Endorsement Letter
- ACHMP Rev 7 19 Feb 2026
- Appointment of Experts
- Approval ACHMP Rev 7
- Approval CTMP Rev XV
- Approval WHAMP Rev 5
- Approval of CEMP
- CEMP V7
- CFERP 805 Mamre Road - v0.4
- CTMP Revision XV
- Dilapidation Report_CAR_A16
- Dilapidation Report_CEMP_A16
- ESCP DCPA Approval
- ESCP_REV 02
- Noise 805MamreRoadCNVMP
- WHAMP Rev 5, 20 Feb 2026
What's near it
Where it is
- Suburb
- Kemps Creek
- Council area
- Penrith
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.