On the map
State significant development

Wanina Battery Energy Storage System

A 500 MW battery on Hanworth Road, Bannaby

Under way: at searsEnergy: batteriesDistrict scale

Where it is in the process

At sears

  1. SEARs (current stage)
  2. Prepare EIS (to come)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Wanina BESS Scoping Report-Revised 30.10.26-Final on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 500 MW battery on Hanworth Road, Bannaby

The proponent proposes a battery energy storage system with a capacity of approximately 500 MW and 4,000 MWh, about eight hours of storage, on Hanworth Road, Bannaby, in the Upper Lachlan Shire. The battery footprint would be about 6 ha, next to the existing Bannaby substation, and a transmission line would connect the two. The estimated development cost is circa $800 million, to be confirmed by a quantity surveyor.

The case is at the stage of preparing the Secretary's environmental assessment requirements (SEARs). The proponent's scoping report, dated 30 October 2026, asks the department to set them. Next, the SEARs are issued and the proponent prepares an environmental impact statement (EIS), which is then exhibited so the public can make submissions. No submissions have been received yet.

Battery power capacity
500 MWWanina BESS Scoping Report-Revised 30.10.26-Final
Battery storage capacity
4,000 MWhWanina BESS Scoping Report-Revised 30.10.26-Final
Estimated development cost
$800MWanina BESS Scoping Report-Revised 30.10.26-Final
Battery footprint
6 haWanina BESS Scoping Report-Revised 30.10.26-Final

The department's description

Battery Energy Storage System (BESS) with a capacity of approximately 500MW/4000MWh and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

1 document in 1 folder, each on the NSW Planning Portal

Request for SEARs1

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.