On the map
State significant development

Wattle Creek Battery Energy Storage System

A 350 MW battery on Canyonleigh Road, Brayton

Under way: at assessmentEnergy: batteriesDistrict scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Wattle Creek BESS EIS Main Text on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 350 MW battery on Canyonleigh Road, Brayton

The proponent proposes a battery energy storage system with a capacity of 350 MW and 1,580 MWh at 1001 Canyonleigh Road, Brayton, in the Upper Lachlan Shire, about 15 km north-west of Marulan. It would have lithium-ion batteries in containers, an on-site substation connecting to the Marulan substation, a transmission line and a research test-bed facility. The environmental impact statement (EIS) gives a capital investment of about $405 million, about 71 direct construction jobs and 15 direct operational jobs.

The EIS is dated March 2025 and was exhibited, drawing 76 submissions: 64 objecting, 8 supporting and 4 commenting. The proponent has prepared an amendment report, accepted by the department on 3 Jul 2026, and the department has asked for more information four times since. The department is assessing the project. Next come the department's assessment report and a decision.

Battery power capacity
350 MWPortal page
Battery storage capacity
1,580 MWhPortal page
Capital investment
$405MWattle Creek BESS EIS Main Text
Direct construction jobs
71 jobsWattle Creek BESS EIS Main Text
Direct operational jobs
15 jobsWattle Creek BESS EIS Main Text
Water use during construction
10.7 megalitresWattle Creek BESS EIS Main Text

The department's description

Development of a 350MW/1580MWh battery energy storage facility with associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

76 submissions: 63 from the public, 12 from organisations and 1 from public authorities

Object64
Support8
Comment4

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

93 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs2
EIS22
Response to Submissions16
Agency Advice45
Amendments2
Additional Information4