On the map
State significant development

Canyonleigh Battery Energy Storage System

A 300 MW battery on Canyonleigh Road, Brayton

Under way: at response to submissionsEnergy: batteriesDistrict scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Canyonleigh BESS EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 300 MW battery on Canyonleigh Road, Brayton

The proponent proposes to build, operate and later decommission a battery energy storage system with a capacity of 300 MW and 1,200 MWh, at 962 Canyonleigh Road, Brayton, in the Goulburn Mulwaree area. The project area is about 130.60 ha. The development footprint is about 21.60 ha, made up of a 15.20 ha battery site and a 6.40 ha road resurfacing area on Canyonleigh Road. No capital investment or job numbers are stated.

The environmental impact statement (EIS) is dated 21 Apr 2026. It drew 62 submissions: 55 objecting, 3 supporting and 4 commenting. The case is at the response to submissions stage, in which the proponent answers the submissions and may amend the project. Next, the department assesses the project with advice from other agencies, and then it is decided. No decision date is given.

Battery power capacity
300 MWPortal page
Battery storage capacity
1,200 MWhPortal page
Project area
130.6 haCanyonleigh BESS EIS
Total development footprint
21.6 haCanyonleigh BESS EIS
Battery development footprint
15.2 haCanyonleigh BESS EIS
Road resurfacing footprint
6.4 haCanyonleigh BESS EIS

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 300MW/1200MWh and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

62 submissions: 51 from the public, 10 from organisations and 1 from public authorities

Object55
Support3
Comment4

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

47 documents in 5 folders, each on the NSW Planning Portal

Request for SEARs1
SEARs1
EIS21
Response to Submissions1
Agency Advice23