Kerrawary Gas Fired Power Station

A 1,200 MW gas-fired power station at Big Hill, Upper Lachlan

Under way: at prepare eisEnergy: otherRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Kerrawary Power Station Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 1,200 MW gas-fired power station at Big Hill, Upper Lachlan

The proponent proposes an open cycle gas turbine power station with a nominal capacity of up to 1,200 MW at 258 Losebeys Road, Big Hill, in the Upper Lachlan Shire, near Goulburn. It would supply the National Electricity Market from December 2033 and act as a strategic reserve for power system reliability. The project also includes grid connection, ancillary buildings and upgrades to local and regional roads. A gas pipeline to supply it is being assessed separately. No capital investment or job numbers are stated.

The proponent lodged a scoping report dated 18 Sep 2026, and the Secretary's environmental assessment requirements (SEARs) were issued on 16 Oct 2026. The case is now at the stage of amending those requirements, and no submissions have been received. Next, the proponent prepares an environmental impact statement (EIS), which is exhibited for public submissions before the department assesses it.

Power station capacity
1,200 MWPortal page

The department's description

Construction and operation of an open cycle gas turbine power station with a nominal capacity of up to 1,200 megawatts (MW) and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

3 documents in 2 folders, each on the NSW Planning Portal

Request for SEARs1
SEARs2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.