Hanworth Battery Energy Storage System
A 1.2 GW battery on Hanworth Road, Bannaby
Where it is in the process
At exhibition, since 19 Nov 2026
Open for comment until 17 Dec 2026. Anyone can make a submission on its page on the Planning Portal.
What it proposes
AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Out of date. This summary was written when the project was at Prepare EIS (summarised 19 Nov 2026); it has since moved to Exhibition.
A 1.2 GW battery on Hanworth Road, Bannaby
The proponent proposes a battery energy storage system with a capacity of about 1.2 GW and 4.8 GWh of storage at 576 Hanworth Road, Bannaby, in the Upper Lachlan Shire. It would sit on about 47.70 ha of rural land, with an onsite switching station and a transmission line of about 1.5 km to the neighbouring 330 kV Transgrid substation. The project would also include access roads, cabling and an upgraded existing building for operational staff. No capital investment or job numbers are stated.
The case is at the stage where the proponent prepares its environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, and agencies have given advice on them. An EIS file is already listed with the case. No submissions have been received. Next, the EIS is exhibited for public comment, the proponent responds to the submissions, and the department then assesses the project.
- Battery power capacity
- 1.2 GWScoping Report
- Battery storage capacity
- 4.8 GWhScoping Report
- Site area
- 47.7 haScoping Report
- Transmission corridor length
- 1.5 kmScoping Report
The department's description
Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 1.2GW/4.8GWh and ancillary infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
32 documents in 5 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
SEARs1
EIS18
- 241025_Hanworth BESS_EIS_Final v2.2
- 47127 Hanworth BESS EDC Cover Letter
- Appendix E.10_Bushfire Assessment Report
- Appendix E.11_Preliminary Hazards Assessment
- Appendix E.12_Soil Impact Assessment Report
- Appendix E.13_Preliminary Site Investigation
- Appendix E.1_Biodiversity Development Assessment
- Appendix E.2_Aboriginal Cultural Heritage Report
- Appendix E.3_Social Impact Assessment
- Appendix E.4 - Accommodation Employment Strategy
- Appendix E.5_Traffic Impact Assessment
- Appendix E.6 - Final Flood Impact Assessment
- Appendix E.7 - Final Prelim Stormwater Strategy
- Appendix E.8_ Landscape and Visual Impact
- Appendix E.9_Noise and Vibration Impact Assessment
- Appendix F.1_Waste Management Plan
- Appendix G.1_Geotechnical Test Pit & Bore Logs
- Application_20261111060742
What's near it
Where it is
- Suburb
- Bannaby
- Council area
- Upper Lachlan Shire
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.