On the map
State significant development

Swallow Tail Battery Energy Storage System

A 375 MW battery at Hanworth Road, Bannaby

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 375 MW battery at Hanworth Road, Bannaby

The proponent proposes a battery energy storage system with a capacity of 375 MW and 1500 MWh at Hanworth Road, Bannaby, in the Upper Lachlan Shire. The site is 40 ha, and the development footprint would be about 8 ha. It would include new 330 kV overhead transmission lines connecting to the existing Bannaby substation, a switchyard, an on-site substation and a new site access from Hanworth Road. No capital investment or job numbers are stated.

The proponent's scoping report is dated 29 Nov 2024. The Secretary's environmental assessment requirements (SEARs) have been issued, and agencies have given advice on them. The case is at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS is exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and decides it.

Battery power capacity
375 MWScoping Report
Battery storage capacity
1,500 MWhPortal page
Site area
40 haScoping Report
Development footprint
8 haScoping Report

The department's description

Development of a 375 MW / 1500 MWh battery energy storage system and associated infrastructure and connection works

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.