Gugaa Battery Energy Storage System

A 1,000 MW battery on Gregadoo East Road, Gregadoo

Under way: at prepare eisEnergy: batteriesRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 1,000 MW battery on Gregadoo East Road, Gregadoo

The proponent proposes a battery energy storage system of about 1,000 MW and 4,000 MWh at 477 Gregadoo East Road, Gregadoo, in the Wagga Wagga City area, about 15 km south-east of the Wagga Wagga urban area. The scoping report says it would be built in 2 stages and occupy about 24 ha of a 40.2 ha lot. It would connect to the adjoining Gugaa Substation, part of the HumeLink transmission project. The scoping report gives an estimated development cost of $350 million.

The scoping report is dated 24 Nov 2025, and the Secretary's environmental assessment requirements (SEARs) have been issued. The proponent is now preparing an environmental impact statement (EIS). Next, the EIS is to be exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and it is determined.

Battery power capacity
1,000 MWPortal page
Battery storage capacity
4,000 MWhPortal page
Estimated development cost
$350MScoping Report
Battery area
24 haScoping Report
Lot area
40.2 haScoping Report

The department's description

Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 1000 MW / 4000 MWh, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.