On the map
State significant development

Gregadoo Solar Farm

Decided: approved on 11 Dec 2018Energy: solarNeighbourhood scale

Where it is in the process

Approved on 11 Dec 2018

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination11 Dec 2018 (done)
  8. Approved11 Dec 2018

What it proposes

The department's description

Development of a 47 megawatt solar farm and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

8 submissions: 8 from organisations

Object0
Support0
Comment8

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

4 changes to the project after its decision, each assessed as a case of its own, newest first.

Gregadoo Solar Farm MOD 4SSD-8825-Mod-4

Under way: at assessment · 3 submissions

Addition of a 200MW/400MWh BESS, additional on-site substation and increase to development footprint area by 5.02ha to include the new access point and track.

Its 50 documents

50 documents in 6 folders, each on the NSW Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application9

See the 9 documents on the Planning Portal

Response to Submissions7

See the 7 documents on the Planning Portal

Agency Advice20

See the 20 documents on the Planning Portal

Amendments8

See the 8 documents on the Planning Portal

Additional Information5

See the 5 documents on the Planning Portal

Its page on the Planning Portal

Mod 1 - Administrative Description of LotsSSD-8825-Mod-1

Withdrawn: withdrawn

Administrative correction to the 'Schedule of Lands' in Appendix 1 of the conditions of consent.

Its 1 documents

1 document in 1 folder, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 3 - Increase capacitySSD-8825-Mod-3

Decided: approved on 22 Aug 2023 by the department (director)

The modification seeks to: • Increase the AC capacity from 43MWAC to 65MWAC; • Increase DC capacity from ~52MWDC to ~75MWDC; • Reduce the spacing between solar panel rows by 55cm from 5.50m to 4.95m

Its 11 documents

11 documents in 5 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Agency Advice2

See the 2 documents on the Planning Portal

Additional Information5

See the 5 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Mod 2 - Transmission Line and SubdivisionSSD-8825-Mod-2

Decided: approved on 5 Mar 2021 by the department (director)

Administrative correction to the 'Schedule of Lands' in Appendix 1 of the conditions of consent, update overhead transmission line connection to underground transmission line and subdivision of lots for the substation.

Its 5 documents

5 documents in 3 folders, each on the NSW Planning Portal

Additional Information1

See the document on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.