On the map
State significant development

Belhaven Battery Energy Storage System

A 400 MW battery on Boiling Down Road, Rowan

Under way: at exhibitionEnergy: batteriesDistrict scale

Where it is in the process

At exhibition, since 10 Nov 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition10 Nov 2026 (current stage)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

Open for comment until 8 Dec 2026. Anyone can make a submission on its page on the Planning Portal.

What it proposes

AI summary. Written from this project's page and its Belhaven BESS Environmental Impact Statement Oct26 on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 400 MW battery on Boiling Down Road, Rowan

The proponent proposes a battery energy storage system with a maximum discharge capacity of 400 MW and storage capacity of 3,985 MWh (about 10 hours of storage), at 233 Boiling Down Road, Rowan, about 10 km south-east of Wagga Wagga. It would connect through an on-site substation and about 1.9 km of underground cable to the Wagga Wagga 330 kV substation, with local road upgrades. Construction would take about 27 months, with a peak workforce of about 200. No capital investment is stated.

The environmental impact statement (EIS) is on exhibition from 10 Nov 2026 to 8 Dec 2026, and no submissions had been recorded at the time of writing. The Secretary's environmental assessment requirements were issued on 15 April 2025. Next, the proponent responds to submissions, then the department assesses the project and recommends a decision.

Battery power capacity
400 MWBelhaven BESS Environmental Impact Statement Oct26
Battery storage capacity
3,985 MWhBelhaven BESS Environmental Impact Statement Oct26
Underground transmission connection
1.9 kmBelhaven BESS Environmental Impact Statement Oct26
Construction period
27 monthsBelhaven BESS Environmental Impact Statement Oct26
Peak construction workforce
200 jobsBelhaven BESS Environmental Impact Statement Oct26

The department's description

Construction and operation of a 400 MW / 3985 MWh Battery Energy Storage System including transmission connection and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.