A 300 MW battery on Gregadoo East Road, Gregadoo

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Wagga South BESS Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 300 MW battery on Gregadoo East Road, Gregadoo

The proponent proposes a battery energy storage system with a capacity of about 300 MW and 1,200 MWh, at 1504 Gregadoo East Road, Gregadoo, about 10 km south-east of the centre of Wagga Wagga, in the Wagga Wagga City Council area. It would connect to the existing Wagga Wagga substation about 700 m to the west. The project site covers about 57 ha, and the battery site itself about 10 ha. No capital investment or job numbers are stated.

The proponent has lodged a scoping report, dated July 2026, and the Secretary's environmental assessment requirements (SEARs) have been issued, with advice from agencies. The case is now at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS is to be exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and a decision follows.

Battery power capacity
300 MWPortal page
Battery storage capacity
1,200 MWhPortal page
Project site area
57 haWagga South BESS Scoping Report
Battery site area
10 haWagga South BESS Scoping Report

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of up to 300 MW / 1200 MWh, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.