Ashfords Road Data Centre, Gregadoo
A 1.4 GW data centre campus at 216 Ashfords Road, Gregadoo
Where it is in the process
At prepare eis
What it proposes
AI summary. Written from this project's page and its Scoping Report - 216 Ashfords Road Gregadoo v4 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 1.4 GW data centre campus at 216 Ashfords Road, Gregadoo
The proponent proposes a data centre campus at 216 Ashfords Road, Gregadoo, about 11 kilometres south of the Wagga Wagga city centre, on rural land of about 103.8 ha. It would have four single-storey buildings with a total floor area of about 189,325 m² and a power demand of up to 1.4 GW. The estimated development cost is about $15 billion. Back-up power would include up to 384 diesel generators. The site is zoned for primary production, where a data centre is prohibited, so the proposal also seeks a change to the Wagga Wagga Local Environmental Plan 2010.
The proponent's scoping report, dated 16 Sep 2026, asked for the Secretary's environmental assessment requirements (SEARs), and those requirements have been issued. The proponent is now preparing an environmental impact statement (EIS). No submissions have been made yet. Next, the EIS is exhibited and the public can make submissions. The department then assesses the project and the rezoning together.
- Estimated development cost
- $15bnScoping Report - 216 Ashfords Road Gregadoo v4
- Total power demand
- 1.4 GWScoping Report - 216 Ashfords Road Gregadoo v4
- Total gross floor area
- 189,325 m²Scoping Report - 216 Ashfords Road Gregadoo v4
- Data centre buildings
- 4 buildingsScoping Report - 216 Ashfords Road Gregadoo v4
- Site area
- 103.8 haScoping Report - 216 Ashfords Road Gregadoo v4
- Diesel back-up generators
- 384 generatorsScoping Report - 216 Ashfords Road Gregadoo v4
The department's description
Construction and 24/7 operation of a data centre campus, comprising four buildings and a total power consumption of up to 1.4 gigawatts (GW). The proposal would also include an accompanying amendment to the Wagga Wagga Local Environmental Plan 2010.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
7 documents in 2 folders, each on the NSW Planning Portal
Request for SEARs3
What's near it
Where it is
- Suburb
- Gregadoo
- Council area
- Wagga Wagga
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.