Whitehaven Solar Farm

A 20 MW solar farm and battery at Kurrajong Creek Road, Narrabri

Decided: approved on 21 Sep 2026Energy: solarNeighbourhood scale

Where it is in the process

Approved on 21 Sep 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination21 Sep 2026 (done)
  9. Approved21 Sep 2026

What it proposes

AI summary. Written from this project's page and its Conditions of Consent and Whitehaven Solar - Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 20 MW solar farm and battery at Kurrajong Creek Road, Narrabri

The project is a 20 MW solar farm with a battery storage system of up to 10 MW and 10 MWh, about 25 km south-east of Narrabri in the Narrabri Shire area. It would use about 50,000 solar panels and a new 66 kilovolt power line, and supply electricity to the adjacent Narrabri Mine. The estimated cost is $56.6 million, with up to 65 construction jobs and 1 operational job. The development footprint is about 88.49 ha.

The environmental impact statement (EIS) was exhibited from 13 Feb 2025 to 13 Mar 2025 and drew 62 submissions on the portal page: 59 objecting, 1 supporting and 2 commenting. The council did not object. The department's assessment report of September 2026 found the project approvable subject to conditions. The department's Executive Director, as the Minister's delegate, approved it on 21 Sep 2026. Next, the proponent must meet the conditions of consent, including plans for traffic and heritage, before work starts.

Capital investment
$56.6MWhitehaven Solar - Assessment Report
Solar generating capacity
20 MWPortal page
Battery power capacity
10 MWWhitehaven Solar - Assessment Report
Battery storage capacity
10 MWhWhitehaven Solar - Assessment Report
Construction jobs
65 jobsWhitehaven Solar - Assessment Report
Operational jobs
1 jobsWhitehaven Solar - Assessment Report
Development footprint
88.49 haWhitehaven Solar - Assessment Report
Site area
100 haWhitehaven Solar - Assessment Report

The department's description

Whitehaven Solar Farm , adjacent to the existing Narrabri Mine which includes the construction, operation and decommissioning of a solar photovoltaic energy generating facility with a 20MW capacity.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

62 submissions: 51 from the public, 10 from organisations and 1 from public authorities

Object59
Support1
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

81 documents in 9 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs1
EIS24
Response to Submissions2
Agency Advice38
Additional Information9
Recommendation2
Determination3