Decided: approved on 26 Jul 2010Mining

Where it is in the process

Approved on 26 Jul 2010

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination26 Jul 2010 (done)
  8. Approved26 Jul 2010

What it proposes

The portal gives no description.

Modifications

7 changes to the project after its decision, each assessed as a case of its own, newest first.

Mod 3MP08_0144-Mod-3

Withdrawn: withdrawn

Its 5 documents

Its page on the Planning Portal

MOD 7 - Bord and Pillar Mining of longwalls 201 and 202MP08_0144-Mod-7

Decided: approved on 23 Nov 2021 by the department (director) · 4 submissions

Revised mining method for two of the approved longwall mining panels (201 and 202) from longwall to bord and pillar mining. The bord and pillar operations would occur concurrently with the existing Narrabri Mine longwall.

Its 14 documents

14 documents in 7 folders, each on the NSW Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application1

See the document on the Planning Portal

Response to Submissions2

See the 2 documents on the Planning Portal

Agency Advice3

See the 3 documents on the Planning Portal

Additional Information3

See the 3 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Narrabri Coal Stage 2 MOD6 - Administrative AdmendmentMP08_0144-Mod-6

Decided: approved on 13 Jan 2017 by the department (executive director)

/

Its 6 documents

6 documents in 3 folders, each on the NSW Planning Portal

Application3

See the 3 documents on the Planning Portal

Recommendation1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Narrabri Coal Stage 2 MOD 5 - Extraction IncreaseMP08_0144-Mod-5

Decided: approved on 9 Dec 2015 by the department (director) · 9 submissions

/

Its 15 documents

Its page on the Planning Portal

Narrabri Coal Stage 2 MOD4 - Temporary Road TransportMP08_0144-Mod-4

Decided: approved on 22 Sep 2015 by the department (executive director) · 5 submissions

/

Its 6 documents

6 documents in 4 folders, each on the NSW Planning Portal

EA1

See the document on the Planning Portal

Response to Submissions1

See the document on the Planning Portal

Recommendation2

See the 2 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 2MP08_0144-Mod-2

Decided: approved on 21 Dec 2011 by Dir(MDA)

Its 5 documents

5 documents in 3 folders, each on the NSW Planning Portal

Application1

See the document on the Planning Portal

EA2

See the 2 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 1MP08_0144-Mod-1

Decided: approved on 30 Mar 2011 by the department (deputy director-general)

Its 5 documents

5 documents in 3 folders, each on the NSW Planning Portal

Application1

See the document on the Planning Portal

EA1

See the document on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.