Upper Hunter Battery Energy Storage System

A 400 MW battery on Campbell Street, Aberdeen

Under way: at response to submissionsEnergy: batteriesDistrict scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 400 MW battery on Campbell Street, Aberdeen

The proponent proposes a battery energy storage system with a capacity of 400 MW and 920 MWh, and associated infrastructure, at Campbell Street, Aberdeen. The site is in the Upper Hunter Shire and Muswellbrook Shire council areas. The environmental impact statement (EIS) lists a transmission line, an underground cable, a switching station, access works, and fencing and landscaping. No capital investment or job numbers are stated.

The case is at the response to submissions stage. The EIS was exhibited and drew 38 submissions: 36 objecting and 2 commenting. The proponent now responds to those submissions and may amend the project. The department then assesses the project with advice from other agencies, and prepares an assessment report and recommendation before it is decided.

Battery power capacity
400 MWPortal page
Battery storage capacity
920 MWhPortal page
Public submissions
38 submissionsPortal page
Submissions objecting
36 submissionsPortal page

The department's description

Battery Energy Storage System (BESS) with a capacity of 400MW/ 920MWh and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

38 submissions: 34 from the public, 2 from organisations and 2 from public authorities

Object36
Support0
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

48 documents in 6 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs3
EIS19
Response to Submissions1
Agency Advice23