Bells Mountain Battery Energy Storage System

A 750 MW battery at Sandy Creek Road, McCully's Gap

Under way: at exhibitionEnergy: batteriesRegional scale

Where it is in the process

At exhibition, since 10 Nov 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition10 Nov 2026 (current stage)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

Open for comment until 8 Dec 2026. Anyone can make a submission on its page on the Planning Portal.

What it proposes

AI summary. Written from this project's page and its Bells Mountain BESS EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 750 MW battery at Sandy Creek Road, McCully's Gap

The proponent proposes a battery energy storage system with a capacity of 750 MW and 1,500 MWh, with associated infrastructure, at 388 and 408 Sandy Creek Road, McCully's Gap, in the Muswellbrook Shire. The project area is 15.62 ha, and the area expected to be disturbed by the battery and road upgrades is 13.48 ha. The project includes upgrades to the Sandy Creek Road and New England Highway intersection. No capital investment or job numbers are stated.

The environmental impact statement (EIS), dated 28 Aug 2026, is on exhibition from 10 Nov 2026 to 8 Dec 2026. No submissions have been recorded yet. Next, the proponent responds to the submissions, often amending the project. The department then assesses it and prepares a report, and a decision follows.

Battery power capacity
750 MWPortal page
Battery storage capacity
1,500 MWhPortal page
Project area
15.62 haBells Mountain BESS EIS
Total impact area
13.48 haBells Mountain BESS EIS

The department's description

Construction of a 750 MW / 1,500 MW-hour battery and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.