Bells Mountain Battery Energy Storage System
A 750 MW battery at Sandy Creek Road, McCully's Gap
Where it is in the process
At exhibition, since 10 Nov 2026
Open for comment until 8 Dec 2026. Anyone can make a submission on its page on the Planning Portal.
What it proposes
AI summary. Written from this project's page and its Bells Mountain BESS EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 750 MW battery at Sandy Creek Road, McCully's Gap
The proponent proposes a battery energy storage system with a capacity of 750 MW and 1,500 MWh, with associated infrastructure, at 388 and 408 Sandy Creek Road, McCully's Gap, in the Muswellbrook Shire. The project area is 15.62 ha, and the area expected to be disturbed by the battery and road upgrades is 13.48 ha. The project includes upgrades to the Sandy Creek Road and New England Highway intersection. No capital investment or job numbers are stated.
The environmental impact statement (EIS), dated 28 Aug 2026, is on exhibition from 10 Nov 2026 to 8 Dec 2026. No submissions have been recorded yet. Next, the proponent responds to the submissions, often amending the project. The department then assesses it and prepares a report, and a decision follows.
- Battery power capacity
- 750 MWPortal page
- Battery storage capacity
- 1,500 MWhPortal page
- Project area
- 15.62 haBells Mountain BESS EIS
- Total impact area
- 13.48 haBells Mountain BESS EIS
The department's description
Construction of a 750 MW / 1,500 MW-hour battery and associated infrastructure
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
32 documents in 6 folders, each on the NSW Planning Portal
Notice of Exhibition1
Early Consultation1
Request for SEARs1
SEARs1
EIS17
- Appendix F - BDAR
- Appendix G - ACHAR
- Appendix H - Historic Heritage Report
- Appendix I - Noise Impact Assessment
- Appendix J - LVIA
- Appendix K - SLAIA
- Appendix L - PSI
- Appendix M - WRIA
- Appendix N - Traffic Impact Assessment
- Appendix O - PHA
- Appendix P - Bushfire Assessment
- Appendix Q - EIA
- Appendix R - SIA
- Appendix S - Ecology OSOM RA
- Application_20260908052053
- Bells First Nations and Stakeholder Engagement Plan
- Bells Mountain BESS EIS
What's near it
Where it is
- Suburb
- McCullys Gap
- Council area
- Muswellbrook
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.