On the map
State significant development

McCullys Gap Battery Energy Storage System

A 400 MW battery on Sandy Creek Road, McCullys Gap

Under way: at response to submissionsEnergy: batteriesDistrict scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 400 MW battery on Sandy Creek Road, McCullys Gap

The proponent proposes a battery energy storage system of 400 MW with four hours of storage (1,600 MWh) on two properties at 380 and 578 Sandy Creek Road, McCullys Gap, about six kilometres north-east of Muswellbrook in the Muswellbrook Shire. It includes a project substation and an 800 metre transmission line to the existing Muswellbrook 330 kV substation. Construction would take about 18 months, with a peak workforce of around 150 workers. It would remove up to 16.92 ha of native vegetation. No capital investment is stated.

The environmental impact statement (EIS), dated August 2026, was exhibited and drew 55 submissions: 54 objecting and 1 commenting. The case is now at the response to submissions stage, where the proponent replies to the issues raised and may amend the project. The department then assesses it and prepares a report before a decision is made. The project also needs approval under national environment law.

Battery power capacity
400 MWEnvironmental Impact Statement
Battery storage capacity
1,600 MWhEnvironmental Impact Statement
Peak construction workforce
150 workersEnvironmental Impact Statement
Construction period
18 monthsEnvironmental Impact Statement
Native vegetation to be removed or modified
16.92 haEnvironmental Impact Statement
Transmission line length
800 mEnvironmental Impact Statement
Public submissions
55 submissionsPortal page

The department's description

Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 400 MW/1600 MWh, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

55 submissions: 52 from the public, 2 from organisations and 1 from public authorities

Object54
Support0
Comment1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.