On the map
State significant development

Kayuga Solar Farm

An 80 to 100 MW solar farm and battery at Kayuga

Under way: at prepare eisEnergy: solarDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its 22-235 Kayuga Solar Farm Scoping Report Final V1.1 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

An 80 to 100 MW solar farm and battery at Kayuga

The proponent proposes to build, run and later decommission a solar farm with a capacity of 80 to 100 MW and a battery energy storage system of 50 MW and 100 MWh at 261 Dorset Road, Kayuga, in the Muswellbrook Shire. The land is about 273.25 ha, about 8 km north-west of Muswellbrook. It would also include a switchyard, access tracks and on-site transmission lines, and connect to a 66kV Ausgrid line to the east. No capital investment is stated.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, and agencies have given advice on them. No submissions have been made yet. Next, the proponent lodges the EIS, which is then exhibited so the public can make submissions. The department then assesses the project.

Solar farm capacity (upper end)
100 MWPortal page
Battery power capacity
50 MWPortal page
Battery storage capacity
100 MWhPortal page
Subject land area
273.25 ha22-235 Kayuga Solar Farm Scoping Report Final V1.1

The department's description

Construction, operation and decommissioning of a 80-100MW solar farm, 50MW/100MWh battery energy storage system and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.