Mt Pleasant Coal

Decided: approved on 22 Dec 1999Mining

Where it is in the process

Approved on 22 Dec 1999

  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (done)
  8. Recommendation (done)
  9. Determination22 Dec 1999 (done)
  10. Approved22 Dec 1999

What it proposes

The portal gives no description.

Modifications

8 changes to the project after its decision, each assessed as a case of its own, newest first.

Mount Pleasant Modification 7DA92/97-Mod-7

Withdrawn: withdrawn

Extension of mine life until 2032.

Its 1 documents

1 document in 1 folder, each on the NSW Planning Portal

Early Consultation1

See the document on the Planning Portal

Its page on the Planning Portal

Mt Pleasant Mod 8 - Extension of mine lifeDA92/97-Mod-8

Decided: approved on 14 Aug 2026 by the department (deputy secretary) · 972 submissions

Proposed modification to extend the life of the mine under DA92/97 for six years to the end of 2032 and increase the approved extraction rate from 10.5 to 12.5 million tonnes per annum

Its 52 documents

Its page on the Planning Portal

Modification 6 - Retransmission FacilityDA92/97-Mod-6

Decided: approved on 8 Nov 2023 by the department (director)

The Modification would allow for the construction and operation of a tower or mast, and associated transmission infrastructure, to re-transmit local DTV signal from the existing Broadcast Australia site at Rossgole Lookout.

Its 14 documents

14 documents in 5 folders, each on the NSW Planning Portal

Modification Application2

See the 2 documents on the Planning Portal

Agency Advice2

See the 2 documents on the Planning Portal

Additional Information7

See the 7 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Mount Pleasant Modification 5 - DW1DA92/97-Mod-5

Decided: approved on 29 Jun 2022 by the department (director)

To rectify an error and enable the operation of the DW1 controlled release dam

Its 4 documents

4 documents in 3 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Mt Pleasant Coal MOD 4 - Rail infrastructureDA92/97-Mod-4

Decided: approved on 16 Nov 2018 by the department (executive director) · 44 submissions

/

Its 37 documents

Its page on the Planning Portal

Mt Pleasant Coal MOD 3 - Mining extensionDA92/97-Mod-3

Decided: approved on 24 Aug 2018 by the Independent Planning Commission · 341 submissions

/.

Its 61 documents

Its page on the Planning Portal

Mt Pleasant Coal MOD2 - Haul Road RelocationDA92/97-Mod-2

Decided: approved on 29 Mar 2017 by the department (director)

/

Its 9 documents

Its page on the Planning Portal

Mod 1 - Shaft RelocationDA92/97-Mod-1

Decided: approved on 19 Sep 2011 by the department (executive director)

Mt Pleasant Coal (Mod 1)

Its 15 documents

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

35 documents in 6 folders, each on the NSW Planning Portal

Determination1

See the document on the Planning Portal

Management Plans and Strategies22

See the 22 documents on the Planning Portal

Reports3

See the 3 documents on the Planning Portal

Independent Reviews and Audits2

See the 2 documents on the Planning Portal

Notifications1

See the document on the Planning Portal

Other Documents6

See the 6 documents on the Planning Portal