A 393 MW solar farm and battery at Strontian Road, Sandigo

Under way: at prepare eisEnergy: solarDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 393 MW solar farm and battery at Strontian Road, Sandigo

The proponent proposes a solar farm of up to 393 MW of generating capacity with a battery energy storage system of approximately 333 MW / 2,664 MWh, on Strontian Road, Sandigo, in Narrandera Shire. The scoping report describes about 654,000 solar panels and an on-site substation connecting to an existing 330 kV transmission line. The site is about 670 ha of farmland, roughly 17 km south-east of Narrandera. The scoping report gives a different, earlier battery size of 335 MW/670 MWh. No capital investment is stated.

The proponent lodged a scoping report in September 2025 and the Secretary's environmental assessment requirements (SEARs) have been issued, then revised for capacity. The proponent is now preparing an environmental impact statement (EIS). No submissions have been made yet. Next, the EIS is exhibited for public submissions, then the proponent responds and the department assesses the project.

Solar farm capacity
393 MWPortal page
Battery power capacity
333 MWPortal page
Battery storage capacity
2,664 MWhPortal page
Solar panels
654,000 panelsScoping Report
Project site area
670 haScoping Report

The department's description

Construction, operation, and decommissioning of a Solar Farm with up to 393 MW of generating capacity and Battery Energy Storage System with a capacity of approximately 333 MW / 2,664 MWh, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.