Approved on 8 Aug 2019
What it proposes
The department's description
Development of a 200 megawatt solar farm with battery storage and associated infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Modifications
2 changes to the project after its decision, each assessed as a case of its own, newest first.
MOD 2 - Changes to Battery Storage SystemSSD-9031-Mod-2
Move from a centralised to decentralised and increase the capacity of the battery energy storage system.
Its 5 documents
5 documents in 3 folders, each on the NSW Planning Portal
Modification Application1
Determination3
Consolidated Consent1
MOD 1 - Disturbance footprint and intersection changeSSD-9031-Mod-1
Update project layout, redesign internal road network and site access, remove the Basic Left Turn at Muntz and Sandingo Roads intersection.
Its 7 documents
7 documents in 5 folders, each on the NSW Planning Portal
Preparation of Modification Report1
Modification Application1
Additional Information2
Determination2
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
87 documents in 9 folders, each on the NSW Planning Portal
Request for SEARs1
SEARs1
EIS14
- 01. Avonlie Solar - EIS
- 02. Avonlie Solar - Appendix A -SEARs
- 03. Avonlie Solar - Appendix B -Layout and Design
- 04. Avonlie Solar - Appendix C1 - Community Consultation P
- 05. Avonlie Solar - Appendix C2 - Agency Consultation
- 06. Avonlie Solar - Appendix D - Biodiversity Assessment
- 07. Avonlie Solar - Appendix E - Aboriginal Cultural Herit
- 08. Avonlie Solar - Appendix F - Visual Impact Assessment
- 09. Avonlie Solar - Appendix G - Noise Assessment
- 10. Avonlie Solar - Appendix H - Soil Survey Report
- 11. Avonlie Solar - Appendix I - Flood Modelling
- 12. Avonlie Solar - Appendix J - Traffic Access Assessment
- 13. Avonlie Solar - Appendix K - Economic Impact Assessment
- Application_20190228010739
Response to Submissions9
Determination3
Management Plans and Strategies43
- Accommodation and Employment Strategy
- Accommodation-and-employmentstrategy_Rev E1
- Approval of Accommodation and Employment Strategy
- Approval of Cultural Heritage Management Plan
- Approval of Emergency Management Plan
- Approval of Environmental Management Strategy
- Approval of Heritage Management Plan
- Approval of Plan Strategy or Study_14072021_011138
- Approval of Plan Strategy or Study_15072021_092904
- Approval of Plan Strategy or Study_15072021_093057
- Approval of Plan Strategy or Study_15072021_093252
- Approval of Plan Strategy or Study_16072021_014826
- Approval of Plan Strategy or Study_16072021_015046
- Approval of Plan Strategy or Study_24072025_040624
- Approval of Plan Strategy or Study_27022025_033932
- Approval of Stormwater Management Plan
- Approval of Traffic Management Plan V2 Apr 2022
- Avonlie SF TMP_Version 4_7th February 2025
- Avonlie Solar Farm SWMP_Rev 01
- BMP Rev 5
- BMP Rev 5 approval letter
- Biodiversity Management Plan
- Biodiversity Management Plan
- Biodiversity Offset Retirement
- Cultural Heritage Management Plan
- EMS _20250206_Clean
- Environment Management Strategy
- Environmental Management Strategy
- Environmental Management Strategy
- Environmental Management Strategy
- Environmental Management Strategy Approval
- Environmental Management Strategy Approval
- Heritage Management Plan
- Heritage Management Plan
- Operation Accomm. & Employment Strategy Approval
- Operation Accommodation & Employment Strategy
- Operational Biodiversity Management Plan
- Operational Biodiversity Management Plan Approval
- Stormwater Management Plan
- Stormwater Management Plan
- Traffic Management Plan
- Traffic Management Plan
- Traffic Management Plan V2 Apr 2022
Independent Reviews and Audits3
Notifications4
Other Documents9
- Attachment A - Consultation with Council_
- Attachment A - Consultation with Narrandera Shire Council
- Attachment B - Consultation with TfNSW
- Attachment B - Consultation with TfNSW_
- PA-33 Approval of revision to vehicle limits
- PA-33 Request for revision to vehicle limits
- PA-39 Approval for vehicle length
- Request for temporary increase to vehicle length
- Temporary Amendment to Heavy Vehicle Restrictions
What's near it
Where it is
- Suburb
- Sandigo
- Council area
- Narrandera
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.