State significant development

Gillenbah Battery Energy Storage System

A 400 MW battery on The Gap Road, Gillenbah

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 400 MW battery on The Gap Road, Gillenbah

The proponent proposes a battery energy storage system with a capacity of about 400 MW / 1,600 MWh, on The Gap Road, Gillenbah, about 16 km south of Narrandera in Narrandera Shire. It would have up to 170 battery containers and about 85 inverters. A new 330 kV overhead line would connect it to an existing Transgrid transmission line, with poles up to 30 m high. The development footprint is about 11.90 ha on a site of about 259.2 ha. Construction is expected to take about 24 months. No capital investment is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The scoping report is dated 19 Dec 2025, with a minor amendment in January 2026, and the Secretary's environmental assessment requirements (SEARs) have been issued. No submissions have been made yet. Next, the EIS would be exhibited and the public could make submissions. The department would then assess the project.

Battery power capacity
400 MWPortal page
Battery storage capacity
1,600 MWhPortal page
Maximum battery units
170 batteriesScoping Report
Site area
259.2 haScoping Report
Development footprint
11.9 haScoping Report
Construction duration
24 monthsScoping Report
Maximum transmission pole height
30 mScoping Report

The department's description

Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 400 MW / 1600 MWh, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.