On the map
State significant development

Spring Creek Solar Farm

A 120 MW solar farm and 360 MW battery at Goonoo Goonoo

Under way: at searsEnergy: solarDistrict scale

Where it is in the process

At sears

  1. SEARs (current stage)
  2. Prepare EIS (to come)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 120 MW solar farm and 360 MW battery at Goonoo Goonoo

The proponent proposes a solar farm with an installed capacity of up to 120 MW and a battery energy storage system of 360 MW / 1,440 MWh, at 279 Middlebrook Road, Goonoo Goonoo, in the Tamworth Regional Council area. The project area is about 291 ha, with a development footprint of about 244.49 ha. It would connect to the existing 330 kV Muswellbrook to Tamworth transmission line, which crosses the site. Solar panels would stand up to 2.8 m high. No capital investment or job numbers are stated.

The case is at an early stage. The proponent's scoping report, dated 28 October 2026, supports a request for the Secretary's environmental assessment requirements (SEARs). Next, the department issues the SEARs, and the proponent prepares an environmental impact statement (EIS). The EIS would then be exhibited so the public can make submissions. No submissions have been made yet.

Solar farm capacity
120 MWScoping Report
Battery power capacity
360 MWScoping Report
Battery storage capacity
1,440 MWhScoping Report
Project area
291 haScoping Report
Development footprint
244.49 haScoping Report
Maximum panel height
2.8 mScoping Report

The department's description

Construction, operation, and decommissioning of a 120 MW Solar Farm and a Battery Energy Storage System with a capacity of approximately 360 MW / 1440 MWh, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.