On the map
State significant development

Kingswood Battery Energy Storage System

A 270 MW battery on Burgmanns Lane, Kingswood

Decided: approved on 19 Mar 2026Energy: batteriesDistrict scale

Where it is in the process

Approved on 19 Mar 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination19 Mar 2026 (done)
  9. Approved19 Mar 2026

What it proposes

AI summary. Written from this project's page and its IPC - Instrument of Determination and Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 270 MW battery on Burgmanns Lane, Kingswood

The project is a battery energy storage system with a capacity of up to 270 MW and 1,080 MWh, at 744 Burgmanns Lane, Kingswood, south-east of Tamworth in the Tamworth Regional Council area. It includes an on-site substation and a connection to the existing Tamworth substation. The department gives a capital investment of $458 million, up to 100 construction jobs and 2 operational jobs.

The environmental impact statement (EIS) was exhibited from 19 Jul 2024 to 15 Aug 2024 and drew 69 submissions: 67 objecting, 1 supporting and 1 commenting. The proponent amended the project twice, in April 2025 and October 2025. The department's assessment report of December 2025 found it approvable subject to conditions, and the Independent Planning Commission approved it on 19 Mar 2026. Next, the proponent must meet the consent's conditions before construction.

Capital investment
$458MAssessment Report
Battery power capacity
270 MWAssessment Report
Battery storage capacity
1,080 MWhAssessment Report
Construction jobs
100 jobsAssessment Report
Operational jobs
2 jobsAssessment Report
Site area
79 haAssessment Report
Development footprint
35.58 haAssessment Report

The department's description

Battery Energy Storage System (BESS) with a capacity of 270MW/1080MWh and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

69 submissions: 65 from the public, 3 from organisations and 1 from public authorities

Object67
Support1
Comment1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

1 change to the project after its decision, each assessed as a case of its own, newest first.

Kingswood BESS - Modification 1SSD-63207219-Mod-1

Under way: at assessment

Modification to the project layout, maximum energy storage capacity, transmission line connection options, the site access location and minor adjustments to the existing 66 kV transmission line.

Its 27 documents

27 documents in 4 folders, each on the NSW Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application14

See the 14 documents on the Planning Portal

Agency Advice9

See the 9 documents on the Planning Portal

Additional Information3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

104 documents in 10 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs2
SEARs1
EIS12
Response to Submissions14
Agency Advice39
Amendments18
Additional Information12
Recommendation3
Determination2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.