Burgmanns Battery Energy Storage System

A 200 MW battery on Burgmanns Lane, Calala

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 200 MW battery on Burgmanns Lane, Calala

The proponent proposes a battery energy storage system of up to 200 MW and up to 1600 MWh at 651 Burgmanns Lane, Calala, about six kilometres south-east of Tamworth, in the Tamworth Regional Council area. A 132 kV underground line would connect it to the existing Tamworth substation, about 400 metres east. The development footprint is about 10 ha. It would create up to 150 construction jobs over 12 to 18 months and about 10 to 12 operational jobs. No capital investment is stated.

The proponent's scoping report, dated 7 Aug 2026, asked for the Secretary's environmental assessment requirements (SEARs), which have been issued. The proponent is now preparing an environmental impact statement (EIS). There are no public submissions yet. Next, the EIS is exhibited and the public can make submissions. The department then assesses the project and it is determined.

Battery power capacity
200 MWScoping Report
Battery storage capacity
1,600 MWhScoping Report
Construction jobs
150 jobsScoping Report
Operational jobs
12 jobsScoping Report
Development footprint
10 haScoping Report
Underground transmission line voltage
132 kVScoping Report

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 200MW/1600MWh and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.