Residential flat building with in-fill affordable housing - 27-29 Tryon Road, Lindfield
A nine-storey, 65-apartment building at Tryon Road, Lindfield
Where it is in the process
Approved on 10 Apr 2026
What it proposes
AI summary. Written from this project's page and its SSD-78669234 Assessment Report and SSD-78669234 Development Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A nine-storey, 65-apartment building at Tryon Road, Lindfield
The project is a nine-storey residential flat building with 65 apartments, 14 of them affordable housing, at 27-29 Tryon Road, Lindfield, in the Ku-ring-gai Council area. It would replace a former nursing home and a house on a site of 3,011.3 m², with four basement levels holding 101 car parking spaces. The estimated development cost is $92,407,586 in one report and $92,475,411 in another.
The environmental impact statement was exhibited from 24 Apr 2025, and the proponent amended the project on 19 Dec 2025. The amended application was exhibited from 16 Jan 2026 to 29 Jan 2026. The portal shows 44 submissions: 37 objecting, 4 supporting and 3 commenting. The department recommended approval. An Executive Director of the department, acting for the Minister, approved it on 10 Apr 2026, with conditions. Next, the proponent must meet the conditions before building starts. The consent lapses after two years unless work has physically started.
- Apartments
- 65 apartmentsSSD-78669234 Development Consent
- Affordable housing apartments
- 14 apartmentsSSD-78669234 Development Consent
- Estimated development cost
- $92.5MSSD-78669234 Assessment Report
- Storeys
- 9 storeysSSD-78669234 Development Consent
- Car parking spaces
- 101 car spacesSSD-78669234 Development Consent
- Site area
- 3,011.3 m²SSD-78669234 Assessment Report
- Gross floor area
- 9,786.7 m²SSD-78669234 Assessment Report
The department's description
Demolition of existing structures and the construction of a nine-storey
residential flat building with 65 apartments, including affordable housing.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
44 submissions: 37 from the public, 5 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
2 changes to the project after its decision, each assessed as a case of its own, newest first.
27-29 Tryon Road MOD 2 - Design AmendmentsSSD-78669234-Mod-2
Basement reconfiguration, increase in building height and floor-to-floor height, reconfiguration of apartment layouts, relocation of plant and additional substation.
Its 22 documents
22 documents in 2 folders, each on the NSW Planning Portal
Notice of Exhibition1
Modification Application21
- Appendix-A-Architectual Plans
- Appendix-B-Design Verification Statement_signed
- Appendix-C-Landscape
- Appendix-D-Heritage-Addendum
- Appendix-E-Building services letter
- Appendix-F - BCA Capability Statement - S4.55 Mod
- Appendix-G -Fire
- Appendix-H-Wind assessment
- Appendix-I-ESD
- Appendix-J- CHP -Bridge Housing letter
- Appendix-K-EDC
- Appendix-L -Traffic
- Appendix-M-Geotech -Updated Report
- Appendix-N-Groundwater Impact Assessment
- Appendix-O-BASIX-Cert
- Appendix-O-BASIX-Report
- Appendix-O-BASIX-Stamped Set
- Appendix-O-NatHERS-Cert
- List of Amendments 261016
- Modification Application Report ((s.4.55(2))
- Modification Application_20261026014030
27-29 Tryon Road, Lindfield MOD 1 - Tree removal and replantingSSD-78669234-Mod-1
Proposed modification for the removal and replanting of one tree (Tree 8) which has been identified as having died since the original consent was granted.
Its 11 documents
11 documents in 3 folders, each on the NSW Planning Portal
Modification Application6
Determination4
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
135 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition2
SEARs2
EIS55
- Appendix 1 - SEARs Compliance Table
- Appendix 10a - BASIX Certificate
- Appendix 10b - NatHERS Certificate
- Appendix 11 - BCA Capability Statement
- Appendix 12a - BDAR Waiver Determination
- Appendix 12b - BDAR Waiver Letter
- Appendix 12c -BDAR Report
- Appendix 13 - CGI - View04 JPG
- Appendix 13 - CGI - View04_TIF
- Appendix 13 - CGI - View06 JPG
- Appendix 13 - CGI - View06 TIF
- Appendix 13 - CGI - View2_JPG
- Appendix 13 - CGI -View 1. TIF
- Appendix 13 - CGI -View1 JPG
- Appendix 13 - CGI -View2_TIF
- Appendix 14 - Connecting with Country Report
- Appendix 15 - CPTED Report
- Appendix 16 - Detailed Site Investigation (DSI) Report
- Appendix 17 -Dewatering Management Plan
- Appendix 18 - Engagement Report
- Appendix 19a - ESD Report
- Appendix 19b - Section J
- Appendix 2 - Statutory Compliance Table
- Appendix 20 - EDC Report - summary
- Appendix 21 - Fire Engineering Report
- Appendix 22 - Geotechnical
- Appendix 23 - Hazardous Materials Survey Report
- Appendix 24 - Statement of Heritage Impact
- Appendix 25a - Integrated Water Management Plan
- Appendix 25b - Integrated Water Management Plan
- Appendix 26 - Infrastructure Delivery Management Plan
- Appendix 27 - Landscape Documentation
- Appendix 28 - Noise and Vibration Assessment
- Appendix 3 - Mitigation Measures Table
- Appendix 30 - Pedestrian Wind Environment
- Appendix 31 - Preliminary Site Investigation (PSI)
- Appendix 32 - Social Impact Assessment
- Appendix 33 - Solar Reflectivity Report
- Appendix 34 - Groundwater Impact Assessment
- Appendix 35a - Site Survey
- Appendix 35b - Site Survey
- Appendix 36 - Transport Impact Assessment
- Appendix 37 - Visual Impact Assessment
- Appendix 38 - Demolition and Construction WMP
- Appendix 39 - Operational Waste Management Plan
- Appendix 4 - Acid Sulfate Soil and Salinity Assessment
- Appendix 6 - Affordable Housing Provider Letter
- Appendix 7 - Historical Archaeological Assessment
- Appendix 8a - Architectural Plans
- Appendix 8b - Design Report
- Appendix 8c - Deisgn Verification Statement
- Appendix 9 - Arboricultural Impact Statement
- Application_20250402042038
- EIS Executive Summary
- Environmental Impact Statement (EIS)
Response to Submissions15
- Appendix 1 - BDAR Waiver - Letter response and determ
- Appendix 10 - Water Management Plan
- Appendix 1A - BDAR Waiver Letter
- Appendix 2 - Statutory Compliance Table
- Appendix 3 - Architectural Plans
- Appendix 4 - Landscape Plans
- Appendix 5 - Building Surveyor Addendum Letter
- Appendix 6 - Geotechnical Report Addendum Letter
- Appendix 7 - Acoustic Addendum Letter
- Appendix 8 - Integrated Water Management Report
- Appendix 9 - Arboricultural Impact Statement
- CGI - Front view
- Request RTS Letter
- Request RTS Letter - Tryon
- Response to Submissions (RtS) Report
Agency Advice14
Amendments36
- Amended Application_20251218051147
- Amendment Acceptance Letter
- Amendment Report - 27-29 Tryon Road Lindfield
- Appendix A - Response to Submissions Report
- Appendix B - Amended Mitigation Measures Table
- Appendix C -Aboriginal Cultural Heritage
- Appendix D - Affordable Housing Provider Letter
- Appendix E - Architectural Plans
- Appendix F -Arboricultural Impact Assessment
- Appendix G - NatHERS Summary Certificate
- Appendix GA - Commitments Summary
- Appendix GB - NatHERS Stamped Plans
- Appendix GC -BASIX Certificate
- Appendix H - BCA Compliance Report
- Appendix I - BDAR Waiver Report
- Appendix J - CGI 1 Front view
- Appendix J - CGI 2 -Front East review
- Appendix J3 - CGI 3 - Courtyard
- Appendix K - Crime Prevention Report (CPTED)
- Appendix L - Clause 4.6 Variation Request (Height)
- Appendix M - Design Report
- Appendix Ma - Design Verification Statement
- Appendix N - Ecological Sustainable Development
- Appendix O - Esitmated Development Cost (EDC) Report
- Appendix P - Fire Engineering
- Appendix Q -Statement of Heritage Impact
- Appendix R - Landscape Plan
- Appendix S- Pedestrian Wind Environment Statement
- Appendix T - Social Impact Assessment
- Appendix U -Solar Reflectivity
- Appendix V - Transport Impact Assessment
- Appendix W - Visual Impact Analysis
- Appendix X - Operational Waste Management
- Appendix Y - Water Management Plan
- Appendix Z - Stormwater and Civil Engineering Plans
- Appendix ZA - Heritage Response to Submissions
Additional Information6
What's near it
Where it is
- Suburb
- Lindfield
- Council area
- Ku-ring-gai
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.