Residential development with in-fill affordable housing at 2-8 Highgate Road, Lindfield
A nine-storey, 84-apartment building at 2-8 Highgate Road, Lindfield
Where it is in the process
Approved on 11 Jun 2026
What it proposes
AI summary. Written from this project's page and its SSD-78493518 Assessment Report and SSD-78493518 Development Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A nine-storey, 84-apartment building at 2-8 Highgate Road, Lindfield
The project is a nine-storey residential flat building at 2-8 Highgate Road, Lindfield, in the Ku-ring-gai area, about 300 m north of Lindfield Railway Station. It has 84 apartments, 16 of them affordable housing, over two levels of basement parking. The building is 30.09 m high on a site of 3,989.1 m², and its estimated development cost is $80,897,611. It is expected to create 90 construction jobs and two operational jobs.
The environmental impact statement (EIS) was exhibited from 1 May 2025 to 28 May 2025. The department received 82 submissions: 76 objecting, 5 supporting and 1 commenting. The proponent responded on 11 Feb 2026 and made further changes. A department executive director, acting for the Minister, approved the project on 11 Jun 2026, with conditions. Next, the proponent must meet those conditions before building starts.
- Estimated development cost
- $80.9MSSD-78493518 Assessment Report
- Apartments
- 84 dwellingsSSD-78493518 Assessment Report
- Affordable housing apartments
- 16 dwellingsSSD-78493518 Assessment Report
- Building height
- 30.09 mSSD-78493518 Assessment Report
- Construction jobs
- 90 jobsSSD-78493518 Assessment Report
- Operational jobs
- 2 jobsSSD-78493518 Assessment Report
- Site area
- 3,989.1 m²SSD-78493518 Assessment Report
- Car parking spaces
- 119 car spacesSSD-78493518 Assessment Report
The department's description
Construction of a nine-storey residential development with in-fill affordable housing.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
82 submissions: 80 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
103 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs2
EIS40
- Appendix A - SEARS Compliance Table
- Appendix AA - Geotechnical Letter
- Appendix AB - Preliminary Site Investigation
- Appendix AC- Building Services Infrastructure
- Appendix AD - Statement of Heritage Impact
- Appendix AE - ADD
- Appendix AF - PHAA
- Appendix AG - Waste Management Plan
- Appendix AI - Title Search and Deposited Plans
- Appendix AJ - Detailed Maps and Plans
- Appendix B - Statutory Compliance Table
- Appendix C - Mitigation Measures Table
- Appendix D - Engagement Outcomes Report
- Appendix E - Architectural Plans
- Appendix F - Architectural Design Statement
- Appendix G - Clause 4.6 Variation
- Appendix I - Survey Plan
- Appendix J - Landscape Plan
- Appendix K - Stormwater Plans
- Appendix L- Letter from Community Housing Provider
- Appendix M - Arboricultural Impact Assessment
- Appendix N - BASIX Certificates
- Appendix N - BASIX Plans
- Appendix N - BASIX Report
- Appendix O - Sustainability Report
- Appendix P - BCA Report
- Appendix Q - Access Report
- Appendix R - Visual Impact Assessment
- Appendix S - Integrated Water Management Report
- Appendix T - Social Impact Assessment
- Appendix U - Traffic and Parking Assessment Report
- Appendix V - Construction Traffic Management Plan
- Appendix W - Noise & Vibration Impact Assessment
- Appendix X - BDAR Waiver Determination
- Appendix Y - BDAR Waiver Letter
- Appendix Z - Geotechnical Site Investigation
- Application_20250417035100
- BDAR Waiver DPHI Determination Letter(3)
- BDAR Waiver Determination
- EIS
Response to Submissions20
- Appendix A - Architectural Plans
- Appendix B - Design Report
- Appendix C - Landscaping Plans
- Appendix D - Acoustic Memo
- Appendix E - Updated Clause 4.6 Variation Request (Height)
- Appendix F - Pedestrian Environment Wind Statement
- Appendix G - Integrated Water Management Report
- Appendix H - Stormwater Management Plans
- Appendix I - Updated BDAR Waiver
- Appendix J - Arboricultural Impact Statement
- Appendix K - Hydrogeological Assessment & DMP
- Appendix L - Updated Geotechnical Site Investigation
- Appendix M - PSI Addendum Letter
- Appendix N - Traffic Memorandum
- Appendix O - Updated Waste Management Plan
- Appendix P - Submissions Register
- Appendix Q - Updated Mitigation Measures
- Appendix R - Updated CHP Letter of Support
- Request RTS Letter
- Response to Submissions (RtS) Report - 2-8 Highgate Road Lindfield
Agency Advice18
- Additional Information - CPHR
- Additional Information - DCCEEW Water
- Additional Information - Ku-ring-gai Council
- Additional Information - SES
- EIS - Ausgrid
- EIS - CPHR
- EIS - DCCEEW Water
- EIS - SES
- EIS - Sydney Trains
- EIS - Sydney Water (1 of 2)
- EIS - Sydney Water (2 of 2)
- EIS - TfNSW
- RtS - Ausgrid
- RtS - CPHR
- RtS - DCCEEW Water
- RtS - Ku-ring-gai Council
- RtS - SES
- RtS - Sydney Trains
Additional Information15
- 2-8 Highgate Road - RFI Response Letter
- Attachment A - Architectural Plans (May 2026)
- Attachment A - Final Architectural Plans (May 2026)
- Attachment A - Updated Architectural Plans
- Attachment A- Updated Architectural Plan (Superseded)
- Attachment B - Landscape Plans (May 2026)
- Attachment B - Updated Landscape Plan (Superseded)
- Attachment C - Updated Clause 4.6
- Attachment C- Updated Clause 4.6 (May 2026)
- Attachment C- Updated Clause 4.6 (Superseded)
- Attachment D- Remedial Action Plan
- Attachment E- Updated Arboricultural Impact Assessment
- Attachment F - IWMR, FIRA, FERP
- Attachment G - BASIX Certificates
- Attachment H - Nathers Certificates
What's near it
Where it is
- Suburb
- Lindfield
- Council area
- Ku-ring-gai
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.