Residential development with in-fill affordable housing - Reid Street and Woodside Avenue, Lindfield
A nine-storey, 89-apartment building at Reid Street, Lindfield
Where it is in the process
Approved on 6 Oct 2026
What it proposes
AI summary. Written from this project's page and its SSD-79261463 - Assessment Report and SSD-79261463 - Instrument on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A nine-storey, 89-apartment building at Reid Street, Lindfield
The project is a nine-storey residential flat building at 1-3 Reid Street and 2-4 Woodside Avenue, Lindfield, in the Ku-ring-gai area, about 300 m from Lindfield Railway Station. It has 89 apartments, including 17 affordable housing apartments, over two levels of basement parking with 118 car spaces. The site is 3,852.8 m² and now has four detached houses. The estimated development cost is $80,623,796, with 443 construction jobs and 18 operational jobs.
The environmental impact statement (EIS) was exhibited from 1 May 2025 to 28 May 2025 and drew 82 submissions: 76 objecting, 5 supporting and 1 commenting. The proponent responded and changed the design, including lowering the height and floor area. The department's assessment recommended approval. The department's Executive Director, as the Minister's delegate, approved it on 6 Oct 2026, with conditions. Next, the proponent must meet those conditions before and during construction.
- Estimated development cost
- $80.6MSSD-79261463 - Assessment Report
- Apartments
- 89 dwellingsSSD-79261463 - Instrument
- Affordable housing apartments
- 17 dwellingsSSD-79261463 - Instrument
- Building height
- 9 storeysSSD-79261463 - Instrument
- Construction jobs
- 443 jobsSSD-79261463 - Assessment Report
- Operational jobs
- 18 jobsSSD-79261463 - Assessment Report
- Car parking spaces
- 118 car spacesSSD-79261463 - Instrument
- Site area
- 3,852.8 m²SSD-79261463 - Assessment Report
The department's description
Construction of a residential development with in-fill affordable housing
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
82 submissions: 80 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
108 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
EIS40
- Appendix A - SEARS Table
- Appendix AA - Geotechnical Letter
- Appendix AB - Preliminary Site Investigation Report
- Appendix AC - Building Services Infrastructure
- Appendix AD - Statement of Heritage Impact
- Appendix AE - Aboriginal Objects Due Diligence Assessment
- Appendix AF - Historical Archaeological Assessment
- Appendix AG - Waste Management Plan
- Appendix AI - Title Search and Deposited Plans
- Appendix AJ - Detailed Maps and Plans
- Appendix AK - Letter from Community Housing Provider
- Appendix AL - Arboricultural Impact Assessment
- Appendix AM - Social Impact Assessment
- Appendix B - Statutory Compliance Table
- Appendix C - Mitigation Measures
- Appendix D - Engagement Outcomes Report
- Appendix E - Architectural Plans
- Appendix F - Architectural Design Report
- Appendix G - Clause 4.6 written request (Height)
- Appendix I - Survey
- Appendix J - Landscape Plan
- Appendix L - Stormwater Management Plan
- Appendix M - Stamped Architecturals
- Appendix N - BASIX Certificate
- Appendix O - Sustainability Report
- Appendix P - BCA Report
- Appendix Q - Access Report
- Appendix R - Visual Impact Assessment
- Appendix S - Integrated Water Management Plan
- Appendix T - Flood Risk Management Report
- Appendix U - Traffic and Parking Assessment Report
- Appendix V - Construction Traffic Management Plan
- Appendix W - Noise and Vibration Impact Assessment
- Appendix X - BDAR Waiver
- Appendix Y - BDAR Waiver Request
- Appendix Z - Geotechnical Site Investigation
- Application_20250422012945
- Environmental Impact Statement
- Updated BDAR Waiver
- Updated BDAR Waiver Determination
Response to Submissions23
- Appendix A - Architectural Plans
- Appendix B - Design Report
- Appendix C - Landscape Plans
- Appendix D - Acoustic Memo
- Appendix E - Traffic Memorandum
- Appendix F - Clause 4.6 Request - Height
- Appendix G - Flood Impact and Risk Assessment
- Appendix H - Flood Management Plan and Summary
- Appendix I - Integrated Water Management Report
- Appendix J – Hydrogeological Assessment
- Appendix K - Wind Report
- Appendix L - Updated Waste Management Plan
- Appendix M - Updated Arboricultural Impact Statement
- Appendix N - Letter of Support
- Appendix O - Submissions Register
- Appendix P – Updated Mitigation Measures Table
- Appendix Q - Shoring Feasibility Letter
- Appendix R - Updated Geotechnical Site Investigation
- Appendix S - Updated BDAR Waiver
- Appendix T - Updated BASIX Certificates
- Appendix U - BASIX Report - NatHERs - Stamped Plans
- Request RTS Letter
- Response to Submissions - Reid and Woodside
Agency Advice18
- Additional Information - DCA Technical Advisory Advice
- Additional Information - DCA Water
- Additional Information - DCCEEW MCEF
- Additional Information - Ku-ring-gai Council
- Additional Information - SES
- EIS - Ausgrid
- EIS - CHPR
- EIS - DCCEEW Water
- EIS - SES
- EIS - Sydney Trains
- EIS - Sydney Water
- EIS - TfNSW
- RtS - CPHR
- RtS - DCCEEW Water
- RtS - Ku-ring-gai Council
- RtS - SES
- RtS - Sydney Trains
- RtS- Ausgrid
Additional Information18
- 2-4 Woodside Avenue Lindfield - RFI Letter
- 2-4 Woodside Avenue, Lindfield - RFI Letter
- 2-4 Woodside Avenue, Lindfield - RFI Letter
- Attachment A - Updated Architectural Plans
- Attachment A - Updated Architectural Plans
- Attachment B - Landscape Plan
- Attachment B - Updated BASIX Certificate
- Attachment C - Addendum to Geotechnical Report
- Attachment C - Updated Clause 4.6
- Attachment D - CHP Letter
- Attachment D - Flood Planning Levels Letter
- Attachment E - Flood Emergency Response Plan
- Attachment E - Updated BASIX Report
- Attachment F - Integrated Water Management Report
- Attachment F - Updated NatHERS Certificate
- Attachment G - Flood Impact and Risk Assessment
- Attachment G - Updated BASIX Stamped Plans
- Attachment I - Employment Estimate
What's near it
Where it is
- Suburb
- Lindfield
- Council area
- Ku-ring-gai
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.