Residential development with infill affordable housing, 59-63 Trafalgar Avenue 1A&1B Valley Road Lindfield
205 apartments with affordable housing at Trafalgar Avenue, Lindfield
Where it is in the process
Approved on 2 Jun 2026
What it proposes
AI summary. Written from this project's page and its Assessment Report and Instrument on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
205 apartments with affordable housing at Trafalgar Avenue, Lindfield
The project is a residential flat building development with in-fill affordable housing at 59-63 Trafalgar Avenue and 1A-1B Valley Road, Lindfield, in the Ku-ring-gai area, within 400 m of Lindfield Station. It would replace five existing dwellings with 205 apartments, including 42 affordable housing apartments, in buildings of up to nine storeys over three levels of basement parking with 320 car spaces. The estimated development cost is $89,188,000, with about 300 construction jobs.
The environmental impact statement was exhibited from 7 May 2025 and drew 225 submissions: 221 objecting, 1 supporting and 3 commenting. The proponent amended the proposal on 31 March 2026, cutting the apartments from 220 to 205. The department recommended approval, and a Deputy Secretary of the department, acting for the Minister, approved it on 2 Jun 2026, with conditions. Next, the proponent must meet the conditions, including design changes, before building.
- Estimated development cost
- $89.2MAssessment Report
- Apartments approved
- 205 apartmentsInstrument
- Affordable housing apartments
- 42 apartmentsInstrument
- Car spaces
- 320 car spacesInstrument
- Site area
- 6,672 m²Assessment Report
- Construction jobs
- 300 jobsAssessment Report
The department's description
Residential flat building development with in-fill affordable housing
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
225 submissions: 223 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
99 documents in 11 folders, each on the NSW Planning Portal
Notice of Exhibition1
Early Consultation1
Request for SEARs1
EIS35
- Appendix AA - OWMP
- Appendix A_SEARs Compliance Table_Trafalgar Avenue
- Appendix B - Architecture Plans
- Appendix B - Notifications
- Appendix BB - SIA
- Appendix C - CHP Cert & Letter
- Appendix CC_Statutory Compliance Table_Trafalagar Avenue
- Appendix D - Design Report
- Appendix DD - EDC Report
- Appendix E - Engagement
- Appendix F - Survey Plan
- Appendix G - BDAR
- Appendix H - CwC
- Appendix I - AHIA
- Appendix J - HIS
- Appendix K - PHAA
- Appendix L - Landscaping Plan
- Appendix M - ESD
- Appendix N - AIA
- Appendix O - Preliminary Site Investigation
- Appendix P_Clause 4.6_Building Height
- Appendix Q - TIA
- Appendix R - CPTED
- Appendix S - IWMP
- Appendix T - Design Verification Statement
- Appendix U - Basix
- Appendix V - Geotech Report
- Appendix W - VIA
- Appendix W - VIA Appendix
- Appendix X - DMP
- Appendix Y - NVIA
- Appendix Z - Hydro Report
- Application_20250424052713
- EIS
- Title Documents
Response to Submissions30
- Amendment Report
- Appendix A - Revised Clause 4.6
- Appendix B - Revised Design Report
- Appendix C - Revised Architectural Plans
- Appendix D - Revised Operational Waste Management Plan
- Appendix E - Revised Landscape Plans
- Appendix F - Revised Transport Impact Assessment
- Appendix G - Revised Heritage Impact Statement
- Appendix H - Revised Construction Traffic Management Plan
- Appendix I - Revised Arborist Report
- Appendix J - Response to Council
- Appendix K - Mitigations Table
- Appendix L - Revised Wind Impact Assessment
- Appendix M - Revised Acoustic Report
- Appendix N - Revised letter from CHP
- Appendix O - BASIX Certificate
- Appendix P - Revised Statutory Compliance Table
- Request RTS Letter
- Response to Submissions (Heritage)
- Revised Dewatering Management Plan
- Revised Freestanding Planter Fill Depths
- Revised Hydrogeology Letter
- Revised NVIA
- Revised Photomontage
- Revised Site Hydrology Report
- Revised Stormwater Management Report
- Revised Stormwater Plans
- Revised Survey Plan
- Revised Visual Impact Assessment
- Submissions Report
Agency Advice10
Additional Information10
What's near it
Where it is
- Suburb
- Lindfield
- Council area
- Ku-ring-gai
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.