ReDirect Resource Recovery Facility St Marys

A 350,000 tonne a year resource recovery facility, St Marys

Under way: at sears expiredWasteDistrict scale

Where it is in the process

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Issued SEARs_01042021_015711 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 350,000 tonne a year resource recovery facility, St Marys

The proponent proposes to build and run a resource recovery facility at 65 Dunheved Circuit, St Marys, in the Penrith council area. It would accept up to 350,000 tonnes a year of waste: 280,000 tonnes of non-putrescible general solid waste, 55,800 tonnes of putrescible general solid waste and 14,200 tonnes of waste tyres. The description also mentions shredding and sorting of clean wood waste. No capital investment or job numbers are stated.

The Secretary's environmental assessment requirements (SEARs) were issued on 1 Apr 2021. They list what an environmental impact statement (EIS) must cover, including waste, traffic, air and odour, water, noise and fire. The portal now shows the SEARs as expired, and no EIS has been lodged. There has been no exhibition, so there are no public submissions. The case is not being assessed.

Maximum waste accepted
350,000 tonnes a yearPortal page
Non-putrescible general solid waste
280,000 tonnes a yearIssued SEARs_01042021_015711
Putrescible general solid waste
55,800 tonnes a yearIssued SEARs_01042021_015711
Waste tyres
14,200 tonnes a yearIssued SEARs_01042021_015711

The department's description

Construction and operation of a Resource Recovery Facility accepting up to 350,000 tonnes per annum of General Solid Waste (putrescible and non-putrescible) and waste tyres, including shredding and sorting of clean wood waste.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.