On the map
State significant development

Grundy's Waste Solutions Resource Recovery Facility

A 159,000 tonne a year waste facility at Links Road, St Marys

Under way: at assessmentWasteNeighbourhood scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its EIS Main Document on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 159,000 tonne a year waste facility at Links Road, St Marys

The proponent proposes to replace an existing waste transport depot at 68–72 Links Road and 7 Dunheved Circuit, St Marys, in the Penrith City Council area, with a resource recovery facility. It would process up to 159,000 tonnes a year: 60,000 tonnes of commercial, industrial and construction waste, 93,000 tonnes of liquid waste and 6,000 tonnes of clinical waste. Two new buildings would operate 24 hours a day, 7 days a week. No capital investment or job numbers are stated.

The environmental impact statement (EIS) is dated 22 Jun 2026. The project has had 5 submissions: 1 objecting, 1 supporting and 3 commenting. The proponent has lodged a response to submissions, and agencies have given advice. Next, the department assesses the project and decides whether to recommend it. The Minister, the department or the Independent Planning Commission then decides it.

Waste processing capacity
159,000 tonnes a yearEIS Main Document
Commercial, industrial and construction waste
60,000 tonnes a yearEIS Main Document
Liquid waste
93,000 tonnes a yearEIS Main Document
Clinical waste
6,000 tonnes a yearEIS Main Document

The department's description

Construction and operation of a resource recovery facility with a processing capacity of 159,000 tonnes per annum of waste material, including construction & demolition, commercial & industrial, liquid and chemical waste.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

5 submissions: 1 from the public, 3 from organisations and 1 from public authorities

Object1
Support1
Comment3

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.