On the map
State significant development

St Marys Chemical Waste Facility

Decided: approved on 22 Dec 2006Waste

Where it is in the process

Approved on 22 Dec 2006

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination22 Dec 2006 (done)
  8. Approved22 Dec 2006

What it proposes

The portal gives no description.

Modifications

6 changes to the project after its decision, each assessed as a case of its own, newest first.

St Marys Chemical Waste MOD 5 - Installation of Fire Water TankMP06_0095-Mod-6

Under way: at prepare mod report

Installation and operation of a 480 kL stainless steel fire water tank and associated infrastructure.

Its page on the Planning Portal

Mod 5 - ECUMP06_0095-Mod-5

Withdrawn: withdrawn

Installation of a new emission control unit.

Its 16 documents

16 documents in 3 folders, each on the NSW Planning Portal

Modification Application4

See the 4 documents on the Planning Portal

Agency Advice3

See the 3 documents on the Planning Portal

Additional Information9

See the 9 documents on the Planning Portal

Its page on the Planning Portal

St Marys Chemical Waste MOD 3 - StorageMP06_0095-Mod-3

Decided: approved on 19 Dec 2018 by the department (director)

/

Its 18 documents

Its page on the Planning Portal

St Marys Chemical Waste MOD 4 - WasteMP06_0095-Mod-4

Decided: approved on 9 Mar 2018 by the department (executive director)

/

Its 27 documents

27 documents in 4 folders, each on the NSW Planning Portal

Application9

See the 9 documents on the Planning Portal

Submissions5

See the 5 documents on the Planning Portal

Response to Submissions11

See the 11 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 2 - Chemical Waste TreatmentMP06_0095-Mod-2

Decided: approved on 3 Mar 2010 by Dir(MDA)

Introduction of chemical immobilisation and solidification (CIS) treatment of selected hazardous waste, alteration to site layout and introduction of additional treatment technologies.

Its 5 documents

5 documents in 3 folders, each on the NSW Planning Portal

Application1

See the document on the Planning Portal

Agency Submissions1

See the document on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Mod 1 - Design ChangesMP06_0095-Mod-1

Decided: approved on 6 Jul 2007 by the Minister

Its 1 documents

1 document in 1 folder, each on the NSW Planning Portal

Application1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Its point is approximate (the register's own, to about a kilometre), and so are these.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.