Grundys Waste Solutions Resource Recovery Facility
A 170,000 tonne a year resource recovery facility, St Marys
Where it is in the process
What it proposes
AI summary. Written from this project's page and its 221179_Scoping_Rev7 compressed on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 170,000 tonne a year resource recovery facility, St Marys
The proponent, Grundy's Waste Solutions, proposes a resource recovery facility at 72 Links Road, 7 Dunheved Circuit and 68 Links Road, St Marys, in the Penrith City Council area. The portal describes a processing capacity of 170,000 tonnes a year. The scoping report gives 60,000 tonnes a year of commercial, industrial and construction waste, about 93,000 tonnes of liquid waste and about 10,000 tonnes of medical waste, a total of 163,000 tonnes. The site of about 1.8 ha is now a waste transport depot, in an industrial zone. Some buildings would be demolished and new industrial buildings built. No capital investment or job numbers are stated.
A scoping report was prepared in May 2024, and the Secretary's environmental assessment requirements (SEARs) were issued on 15 May 2024. The SEARs have since expired. No environmental impact statement has been exhibited and there are no submissions. Next, the proponent would need to request new SEARs before preparing an environmental impact statement.
- Processing capacity (portal)
- 170,000 tonnes a yearPortal page
- Commercial, industrial and construction waste
- 60,000 tonnes a year221179_Scoping_Rev7 compressed
- Liquid waste
- 93,000 tonnes a year221179_Scoping_Rev7 compressed
- Medical waste
- 10,000 tonnes a year221179_Scoping_Rev7 compressed
- Total waste processing (scoping report)
- 163,000 tonnes a year221179_Scoping_Rev7 compressed
- Site area
- 1.8 ha221179_Scoping_Rev7 compressed
The department's description
Construction and operation of a resource recovery facility with a processing capacity of 170,000 tonnes per annum of waste material.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
7 documents in 2 folders, each on the NSW Planning Portal
Request for SEARs4
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.