Puggoon Solar Farm

A 264 MW solar farm and battery at Jacksons Lane, Beryl

Under way: at prepare eisEnergy: solarDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 264 MW solar farm and battery at Jacksons Lane, Beryl

The proponent proposes a solar farm with an installed capacity of up to 264 MWp and a battery energy storage system of 110 MW / 440 MWh, at 340 Jacksons Lane, Beryl, in the Mid-Western Regional Council area. The project area is about 553 ha, with a disturbance area of 505 ha, about 10 km north-west of Gulgong. The solar arrays would cover about 453 ha. A new substation would connect to an existing 330 kV transmission line that crosses the site. No capital investment or job numbers are stated.

The proponent lodged a scoping report dated 6 May 2025 and the Secretary's environmental assessment requirements (SEARs) have been issued. The case is now at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS is exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and it is decided.

Solar farm capacity
264 MWpScoping Report
Battery power capacity
110 MWScoping Report
Battery storage capacity
440 MWhScoping Report
Project area
553 haScoping Report
Disturbance area
505 haScoping Report
Solar array area
453 haScoping Report

The department's description

264 MW Solar Farm and 110 MW / 440 MWh Battery Energy Storage System

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.