On the map
State significant development

Mavis Solar Farm

A 250 MW solar farm and battery at Puggoon Road, Beryl

Under way: at prepare eisEnergy: solarDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 250 MW solar farm and battery at Puggoon Road, Beryl

The proponent proposes a solar farm with 250 MW of capacity and a battery energy storage system of 100 MW and 200 MWh, at 142-144 Puggoon Road, Beryl, in the Mid-Western Regional Council area. The scoping report puts the capital investment at approximately $280 million, subject to detailed costing. The site is about 6 km north-west of Gulgong and is now used for grazing. About 65-70% of it would hold solar panels. The farm would connect to the Wollar to Wellington 330 kV transmission line.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, and agencies have given advice on them. No date is given for these steps. No submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited for public submissions, and then the department assesses the project.

Capital investment
$280MScoping Report
Solar capacity
250 MWScoping Report
Battery power capacity
100 MWScoping Report
Battery storage capacity
200 MWhScoping Report
Share of site for solar panels
70 per centScoping Report

The department's description

A 250 MW Solar farm, associated infrastructure and battery energy storage system

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.