Beryl Battery Energy Storage System

A 100 MW battery at Holleys Lane, Gulgong

Under way: at assessmentEnergy: batteriesDistrict scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Beryl BESS EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 100 MW battery at Holleys Lane, Gulgong

The proponent proposes a battery energy storage system with a capacity of up to 100 MW and 200 MWh at 5 Holleys Lane, Gulgong, about 6.3 km north-west of Gulgong, in the Mid-Western Regional Council area. It would connect by a 132 kV underground cable to the existing Beryl Substation, which would be upgraded. The environmental impact statement (EIS) gives a capital investment of $55 million, up to 40 full time equivalent staff at peak construction and up to 2 during operation.

The EIS is dated 12 Jul 2024. The project drew 66 submissions: 65 objecting and 1 commenting. The proponent has since responded to submissions and amended the project. The department is now assessing it with advice from other agencies. Next, the department prepares its assessment report and recommendation, and then the project is determined. No determination date is stated.

Battery power capacity
100 MWBeryl BESS EIS
Battery storage capacity
200 MWhBeryl BESS EIS
Capital investment
$55MBeryl BESS EIS
Peak construction staff
40 full time equivalent staffBeryl BESS EIS
Operational staff
2 full time equivalent staffBeryl BESS EIS
Native vegetation removed
4.07 haBeryl BESS EIS
Nearby non-associated receivers
28 receiversBeryl BESS EIS

The department's description

Development of a 100 MW / 200 MWh battery energy storage facility with associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

66 submissions: 58 from the public, 7 from organisations and 1 from public authorities

Object65
Support0
Comment1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

78 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs1
EIS22
Response to Submissions8
Agency Advice22
Amendments2
Additional Information21

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.