Beryl Battery Energy Storage System
A 100 MW battery at Holleys Lane, Gulgong
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its Beryl BESS EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 100 MW battery at Holleys Lane, Gulgong
The proponent proposes a battery energy storage system with a capacity of up to 100 MW and 200 MWh at 5 Holleys Lane, Gulgong, about 6.3 km north-west of Gulgong, in the Mid-Western Regional Council area. It would connect by a 132 kV underground cable to the existing Beryl Substation, which would be upgraded. The environmental impact statement (EIS) gives a capital investment of $55 million, up to 40 full time equivalent staff at peak construction and up to 2 during operation.
The EIS is dated 12 Jul 2024. The project drew 66 submissions: 65 objecting and 1 commenting. The proponent has since responded to submissions and amended the project. The department is now assessing it with advice from other agencies. Next, the department prepares its assessment report and recommendation, and then the project is determined. No determination date is stated.
- Battery power capacity
- 100 MWBeryl BESS EIS
- Battery storage capacity
- 200 MWhBeryl BESS EIS
- Capital investment
- $55MBeryl BESS EIS
- Peak construction staff
- 40 full time equivalent staffBeryl BESS EIS
- Operational staff
- 2 full time equivalent staffBeryl BESS EIS
- Native vegetation removed
- 4.07 haBeryl BESS EIS
- Nearby non-associated receivers
- 28 receiversBeryl BESS EIS
The department's description
Development of a 100 MW / 200 MWh battery energy storage facility with associated infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
66 submissions: 58 from the public, 7 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
78 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
SEARs1
EIS22
- Appendix A - SEARS and MWRC comments
- Appendix B - Statutory compliance
- Appendix C - Summary of management measures
- Appendix D - Project engagement
- Appendix E - Biodiversity development assessment report
- Appendix F - ACHAR and HHAR
- Appendix G - Soil sampling investigation
- Appendix H - Landscape character and visual impact
- Appendix I - Noise and vibration impact assessment
- Appendix J - Traffic and transport impact assessment
- Appendix K - Hydrology and hydraulic assessment
- Appendix L - Site water balance
- Appendix M - Preliminary hazard analysis
- Appendix N - Bushfire assessment
- Appendix O - Electromagnetic fields assessment
- Appendix P - Socio-economic impact assessment
- Appendix Q - Construction workforce accomodation strategy
- Appendix R - Preliminary waste management plan
- Application Form
- BOAMs evidence
- Beryl BESS EIS
- EDC Cover Letter
Response to Submissions8
Agency Advice22
- Advice on EIS - BCS
- Advice on EIS - Crown Lands
- Advice on EIS - DCCEEW Water
- Advice on EIS - DPI Ag
- Advice on EIS - F&R
- Advice on EIS - HNSW ACH
- Advice on EIS - Heritage Council
- Advice on EIS - Mid-Western Regional Council
- Advice on EIS - NSW Resources
- Advice on EIS - RFS
- Advice on EIS - TfNSW
- Advice on SEARs - BCS
- Advice on SEARs - Resources
- Advice on SEARs - TFNSW
- SEARs Advice - Council
- SEARs Advice - Crown Lands
- SEARs Advice - DPI Ag
- SEARs Advice - EPA
- SEARs Advice - F&R
- SEARs Advice - Heritage Council of NSW
- SEARs Advice - Heritage NSW (ACH)
- SEARs Advice - RFS
Amendments2
Additional Information21
- Applicant RFI Response - 11 April 2025
- Attachment 1 - HNSW ACH Response
- Attachment 2 - TFNSW Response
- Consolidated Response - 27 January 2026
- Flooding memo - 4 July 2025
- Letter Response - Workforce Accommodation Strategy - 19 December 2025
- Letter Response – Flood and Basin Design - 19 December 2025
- Memo for Council - 3 December 2025
- Noise memo - 17 July 2025
- Noise memo - 19 November 2025
- Preliminary Site Investigation - 15 July 2025
- Project Layout Figure - 11/09/2026
- Request for Additional Information - 18/12/2025
- Request for Additional Information 15/05/2025
- Request for Additional Information 26/5/2025
- Request for Additional Information 30/5/2025
- Request for Information - 4/03/2025
- Response to Agency advice 31 Aug 2026 (PDF)
- Traffic Memo - 1 October 2025
- Traffic Memo - 3 Dec 2025
- Workforce Accom Memo - 10 November 2025
What's near it
Where it is
- Suburb
- Gulgong
- Council area
- Mid-Western Regional
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.