On the map
State significant development

Narromine Battery Energy Storage System

A 125 MW battery on Dappo Road, Narromine

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 125 MW battery on Dappo Road, Narromine

The proponent proposes a battery energy storage system with a capacity of up to 125 MW and 250 MWh at 426 Dappo Road, Narromine, in the Narromine Shire. It would sit on about 3 ha of grazing land, around 3.5 km south-east of central Narromine, next to an existing 132 kV substation. The scoping report expects about 40 full-time equivalent jobs at the peak of construction and about 2 permanent jobs in operation. It gives a capital investment of greater than $30 million.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, with advice from agencies. No submissions have been made yet. Next, the proponent submits the EIS, which is exhibited so the public can make submissions. The department then assesses the project and decides it.

Battery power capacity
125 MWScoping Report
Battery storage capacity
250 MWhScoping Report
Capital investment (more than)
$30MScoping Report
Peak construction jobs
40 jobsScoping Report
Operational jobs
2 jobsScoping Report
Development area
3.04 haScoping Report

The department's description

A battery energy storage system of 125 MW / 250 MWh including associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Narromine
Council area
Narromine

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.