On the map
State significant development

Burroway Wind Farm

A 75-turbine wind farm and battery near Narromine

Under way: at prepare eisEnergy: windDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 75-turbine wind farm and battery near Narromine

The proponent proposes a wind farm of up to 75 wind turbines, with a generating capacity of approximately 400 MW, on the Dubbo-Burroway Road north of Narromine, in the Narromine Shire and Dubbo Regional council areas. It would also include a battery with an installed capacity of 200 MW / 800 MWh, a substation and access roads. Turbine tips would reach up to 280 m. The project area covers 6,568 ha, and the preliminary development footprint is 488.34 ha. No capital investment or job numbers are stated.

The proponent's scoping report is dated 12 December 2025. The Secretary's environmental assessment requirements (SEARs) have been issued, with advice from agencies. The case is at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS is exhibited and the public can make submissions. No submissions have been made yet.

Wind turbines
75 turbinesScoping Report
Wind farm generation capacity
400 MWScoping Report
Battery power capacity
200 MWScoping Report
Battery storage capacity
800 MWhScoping Report
Maximum turbine tip height
280 mScoping Report
Project area
6,568 haScoping Report
Preliminary development footprint
488.34 haScoping Report

The department's description

Construction, operation and decommissioning of a wind farm with up to 75 wind turbines, battery storage and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Burroway
Council areas
Narromine, Dubbo Regional

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.