On the map
State significant development

Burroway Solar Farm

A 100 MW solar farm and battery at Burroway, near Narromine

Decided: approved on 9 Mar 2026Energy: solarDistrict scale

Where it is in the process

Approved on 9 Mar 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination9 Mar 2026 (done)
  9. Approved9 Mar 2026

What it proposes

AI summary. Written from this project's page and its IPC - Instrument of Determination and Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 100 MW solar farm and battery at Burroway, near Narromine

The project is a solar farm with a generating capacity of up to 100 MW and a battery of up to 100 MW and 400 MWh, at 1955 Eumungerie Road, Burroway, north of Narromine in the Narromine Shire. It includes an on-site substation, a connection to the existing 132 kV transmission line and a temporary workers accommodation camp added during assessment. About 0.11 ha of native vegetation would be cleared. The capital investment and construction jobs are not legible in the text available.

The environmental impact statement (EIS) was exhibited and drew 84 submissions: 81 objecting, 2 supporting and 1 commenting. The proponent responded to submissions and amended the project in December 2025. The department's assessment report of December 2025 found it approvable subject to conditions, and the Independent Planning Commission approved it on 9 Mar 2026. Next, the proponent must meet the conditions, including a voluntary planning agreement with the council, before construction.

Battery power capacity limit
100 MWIPC - Instrument of Determination
Battery storage capacity limit
400 MWhIPC - Instrument of Determination
Native vegetation to be cleared
0.11 haAssessment Report
Maximum heavy vehicle movements a day in construction
58 movementsIPC - Instrument of Determination
Submissions received
84 submissionsPortal page

The department's description

Development of a 100MW solar farm with energy storage and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

84 submissions: 78 from the public, 5 from organisations and 1 from public authorities

Object81
Support2
Comment1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

101 documents in 11 folders, each on the NSW Planning Portal

Early Consultation2
Request for SEARs1
SEARs1
EIS14
Exhibition1
Response to Submissions8
Agency Advice58
Amendments2
Additional Information9
Recommendation3
Determination2

What's near it

Where it is

Suburb
Burroway
Council area
Narromine

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.