Mixed Use Development at Green Square Town Centre - Sites 8 and 19
About 800 homes and student housing at Green Square, Zetland
Where it is in the process
At response to submissions
What it proposes
AI summary. Written from this project's page and its 0 - Stage 4 and 5 - EIS and Rezoning Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
About 800 homes and student housing at Green Square, Zetland
The proponent proposes a mixed use development on Sites 8 and 19 of the Green Square Town Centre, at 411 Botany Road and 6 Geddes Avenue, Zetland, in the City of Sydney. It comprises six buildings with approximately 800 residential dwellings and 514 student accommodation units, plus retail space, basement car parking, public domain and landscaping works, and subdivision. It also seeks a concurrent rezoning. No capital investment is stated.
The environmental impact and rezoning statement is dated 19 Feb 2026. The project has reached the response to submissions stage, with 20 submissions: 16 objecting, 1 supporting and 3 commenting. Next, the proponent responds to the submissions and may amend the project. The department then assesses it, with advice from other agencies, and a decision follows.
- Residential dwellings
- 800 dwellingsPortal page
- Student accommodation units
- 514 unitsPortal page
- Buildings
- 6 buildingsPortal page
- Submissions
- 20 submissionsPortal page
The department's description
Mixed use development comprising six buildings including approx 800 residential dwellings and 514 student accommodation units, retail space, basement car parking, associated public domain and landscaping works, subdivision and a concurrent rezoning
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
20 submissions: 18 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
82 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
SEARs3
EIS62
- 0 - Estimated Development Cost
- 0 - Stage 4 and 5 - EIS and Rezoning Statement
- Appendix A - SEARs and Rezoning Requirements Table
- Appendix B1 - Architectural Plans
- Appendix B2 - Architectural Plans
- Appendix B3 - Architectural Plans
- Appendix B4 - Architectural Plans
- Appendix C - Statutory Compliance Table
- Appendix D - Project Mitigation Measures
- Appendix E - Survey Plan
- Appendix F1 - Draft Plan of Subdivision
- Appendix F2 - Draft Plan of Subdivision
- Appendix G - Civil Drawings
- Appendix H - Landscape Plans
- Appendix I1 - Design Report
- Appendix I2 - Design Verification Statements
- Appendix J - Alternative Design Excellence Strategy
- Appendix K - Connecting with Country Framework
- Appendix L - Aboriginal Culture Heritage Assessment Report
- Appendix M1 - Remediation Action Plan
- Appendix M2 - Remediation Action Plan
- Appendix N - BDAR Waiver
- Appendix O1 - ESD Report
- Appendix O2 - Net Zero Statement
- Appendix O3 - NatHERS Endorsed Drawings
- Appendix O4 - Section J Certification
- Appendix O5 - Embodied Emission Material Form - BSMT
- Appendix O5 - Embodied Emission Material Form - Landscape
- Appendix O5 - Embodied Emission Material Form - Retail
- Appendix O5 - Embodied Emission Material Form - Stu Accom
- Appendix P - BASIX Certification
- Appendix Q - Flood Impact and Risk Assessment
- Appendix R1 - Heritage Impact Statement
- Appendix R2 - Heritage Impact Statement
- Appendix S - Geotechnical Report
- Appendix T - Engagement Report
- Appendix U - Infrastructure and Utilisies Assessment Report
- Appendix V - Detailed Site Investigation
- Appendix W - Site Audit Statement
- Appendix X - Wind Impact Assessment
- Appendix Y1 - Transport Impact Assessment
- Appendix Y2 - Transport Impact Assessment
- Appendix Y3 - Transport Impact Assessment
- Appendix Y4 - Transport Impact Assessment
- Appendix Y5 - Transport Impact Assessment
- Appendix Y6 - Transport Impact Assessment
- Appendix Z1 - Response to DRP Comments
- Appendix Z2 - DRP 2.4 Advice
- Application_20260219055127
- BAppendix AA - Visual Impact Assessment
- BAppendix BB - Arboricultural Impact Assessment
- BAppendix CC - Noise and Vibration Impact Assessment
- BAppendix DD - Waste Management Plan
- BAppendix EE - Integrated Water Management Plan
- BAppendix FF - Social Impact Assessment
- BAppendix GG - Economic Impact Statement
- BAppendix HH - Historical Archaeological Assessment
- BAppendix II - Accessibility Report
- BAppendix JJ - Aviation Report
- BAppendix KK - Natural Ventilation Assessment Report
- BAppendix LL - Groundwater Impact Assessment
- BAppendix MM - Draft 88B Instrument
Response to Submissions1
Agency Advice13
- Ausgrid Mixed Dev - Green Square Town Centre S8 S19 (SSD-84322496)
- CASA comments Development Green Square Sites 8 and 19
- CPHR EIS Advice on SSD-84322496
- CoS Submission GSTC Sites 8 and 19
- DCCEEW Water response - Green Square TC Sites 8 & 19 EIS
- EPA response to Green Square Town Centre Stage 3
- HNSW ACH - EIS - Green Square Sites 8 and 19 - SSD-84322496
- HNSW EH - EIS - Green Square Sites 8 and 19 - SSD-84322496
- NSW SES Response Green Square Town
- SWC Response - SSD-84322496
- Syd Airport 26-0425 -Comments to NSW DPIE
- TfNSW (Sydney Trains) Submission Letter SSD-84322496 mk
- TfNSW Response - 31.3.26 - SSD84322496
Additional Information1
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.