Green Square Town Centre HDA Scheme - Early Works SSD
Early works and subdivision at 6 Geddes Ave, Zetland
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Early works and subdivision at 6 Geddes Ave, Zetland
The proponent proposes early works on a 1.351 ha site at 6 Geddes Avenue and 411 Botany Road, Zetland, in the City of Sydney, next to Green Square Station. The works include site establishment, tree removal, bulk excavation for future basements, piled basement retention, on-site storage of contaminated soil and services work. It also seeks a procedural subdivision creating a stratum lot for Site 8B and a residue lot. The works would prepare for later main works applications. No capital investment or number of homes is stated.
The environmental impact statement (EIS) is dated 17 Nov 2025. The case drew 29 submissions: 19 objecting, 2 supporting and 8 commenting. The proponent has responded to submissions, and the department has asked for additional information three times. The case is now at the More Information Required stage. Next, the department assesses the response and further information, and then decides it.
- Site area
- 1.35 haEIS
- Submissions
- 29 submissionsPortal page
- Submissions objecting
- 19 submissionsPortal page
- Submissions supporting
- 2 submissionsPortal page
- Submissions commenting
- 8 submissionsPortal page
The department's description
Early works (civil and excavation works) for SSD- 84322496 together with a procedural subdivision creating a stratum lot for Site 8B and a residue lot for the remainder of the site
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
29 submissions: 26 from the public, 1 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
80 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
SEARs3
EIS31
- Appendix A. Architectural Plans
- Appendix AA. Groundwater Impact Assessment
- Appendix B. SEARs Compliance Table
- Appendix BB. Integrated Water Management Plan
- Appendix C. Statutory Compliance Table
- Appendix CC. Flood Impact Response Letter
- Appendix D. Community Engagement Table
- Appendix E. Mitigation Measures
- Appendix G. Civil Plans
- Appendix H. Survey Plans
- Appendix I. Remediation Action Plan
- Appendix J. Aboricultural Assessment Report
- Appendix K. BDAR Waiver
- Appendix L. Consultation Outcomes Report
- Appendix M. Construction Pedestrian Traffic Management Plan
- Appendix N. Detailed Site Investigation
- Appendix O. Fill Retention Risk Assessment
- Appendix P. Noise and Vibration Impact Assessment
- Appendix Q. Geotechnical Report
- Appendix R. Aboriginal Cultural Heritage Assessment Report
- Appendix S. Historical Archaeological Assessment
- Appendix T. Statement of Heritage Impact
- Appendix U. Waste Management Plan
- Appendix V. Air Quality Impact Assessment
- Appendix W. Structural Plans
- Appendix X. Construction Environmental Management Plan
- Appendix Y. Interim Audit Advice
- Appendix Z. Draft Plan of Subdivision
- Application_20251124045646
- EDC Report
- EIS
Response to Submissions22
- Appendix A - Submissions Register
- Appendix B - Updated Mitigation Measures
- Appendix C - Civil Response to Submissions Statement
- Appendix D - Additional Civil Plans
- Appendix E - Archaeology Response to Submissions Statement
- Appendix F - Updated Historical Archaelogical Assessment
- Appendix G1 - Updated ACHAR
- Appendix G2 - Updated ACHA Consultation Documents
- Appendix H - Geotechnical Response to Submissions
- Appendix J - Contamination Statement
- Appendix K - Landscaping Response to Submissions Statement
- Appendix L - Main Works Landscape Plans
- Appendix M - Train Easement Plan
- Appendix N - Updated Architectural Drawings
- Appendix O - Construction Traffic Management Plan
- Appendix P - Construction Environmental Management Plan
- Appendix Q - Early Works Structural Set
- Appendix R - CNVMP
- Appendix S - Construction Noise and Vibration Statement
- Appendix T - Updated Civil Plan
- GSTC Early Works SSDA 82328958 - RTS Report
- Request RTS Letter - Green Square Early Works
Agency Advice19
- Ausgrid Green Square Town Centre - Early Works (SSD-82328958)
- CASA - Green Square Town Centre HDA early works
- CPHR Advice Letter - SSD-82328958
- City of Sydney - Green Square Town Centre HDA early works
- CoS to DPHI - RTS - Green Square Town Centre early works
- DCCEEW Water -Green Square Town Centre HDA Early Works RTS
- DDECCW Water Group -Green Square Town Centre HDA Scheme - SSD - SSD-82328958
- EPA response Greensquare Town Centre SSD82328958
- HNSW ACH - EIS - Green Square Early Works - SSD-82328958
- HNSW ACH - RtS - Green Square Early Works - SSD-82328958
- HNSW EH - EIS - Green Square Early Works - SSD-82328958
- HNSW EH - RtS - Green Square Early Works - SSD-82328958
- NSW DoE -SSD-82328958 6 Geddes Ave, Zetland
- NSW EPA response to Green Square Town Centre HDA Scheme
- SWC Response - 6 Geddes Ave Zetland
- TfNSW (Sydney Trains) EIS Submission Letter SSD-82328958
- TfNSW Response - SSD-82328958
- TfNSW Submission for SSD-82328958 - EIS
- TfNSW-Sydney Trains RTS SSD-82328958
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.