1,070 to 1,200 homes in Green Square Town Centre, Zetland

Withdrawn: withdrawnHomesDistrict scale

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

AI summary. Written from this project's page and its Industry Specific SEARs - Housing3689007 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

1,070 to 1,200 homes in Green Square Town Centre, Zetland

The proposal was for 1,070 to 1,200 units across nine buildings on three sites in the Green Square Town Centre, Zetland, in the City of Sydney. The buildings would range from 9 to 24 storeys, with ground-floor retail and basement car parking. The proponent was exploring a mix of build-to-sell and build-to-rent homes. The sites are at 960A Bourke Street, 411 Botany Road and 6 Geddes Avenue. No capital investment is stated.

The department issued the Secretary's environmental assessment requirements (SEARs) on 1 Apr 2025. They set out what the environmental impact statement (EIS) must cover, including built form, overshadowing, transport, noise, flooding and contamination. No EIS was exhibited and no submissions were received. The application was later withdrawn, so it was never decided. The date of the withdrawal is not stated.

Homes proposed (lower end)
1,070 dwellingsPortal page
Homes proposed (upper end)
1,200 dwellingsPortal page
Buildings
9 buildingsPortal page
Superlot sites
3 sitesPortal page
Maximum building height
24 storeysPortal page

The department's description

SSD - 1070 to 1200 units across 9 buildings in three superlot sites within the Green Square Town Centre. Height ranges between 9-24 storeys with ground oor retail and associated basement carparking. Exploring combination of BTS and BTR options.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

1 document in 1 folder, each on the NSW Planning Portal

SEARs1

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.