On the map
State significant development

McMahons Reef Solar Farm

Withdrawn: withdrawnEnergy: solarDistrict scale

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

The department's description

Construction of a 100 MW solar farm, a battery energy storage system and ancillary infrastructure including onsite substation and connection to the 132kV transmission line

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

1 document in 1 folder, each on the NSW Planning Portal

SEARs1

See the document on the Planning Portal

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.