On the map
State significant development

Derringullen Battery Energy Storage System

A 400 MW battery on Yass Valley Way, Yass

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 400 MW battery on Yass Valley Way, Yass

The proponent proposes a grid-scale battery energy storage system with a discharge capacity of about 400 MW and storage of 1,600 MWh, on Yass Valley Way, on the north-western outskirts of Yass in the Yass Valley Council area. The development footprint would be in the order of 9 ha. It would connect to an existing 330 kV transmission line that runs through the site. No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The scoping report was issued on 25 Jul 2024, and the Secretary's environmental assessment requirements (SEARs) were amended on 29 May 2026. No public submissions have been made yet. Next, the EIS is exhibited, the public can make submissions, and the department then assesses the project.

Battery power capacity
400 MWPortal page
Battery storage capacity
1,600 MWhPortal page
Development footprint
9 haScoping Report

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 400MW/1,600MWh and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Its point is approximate (the register's own, to about a kilometre), and so are these.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.