On the map
State significant development

North Ridge Quarry Regional Landfill

A regional landfill at North Ridge Quarry, Berremangra

Under way: at prepare eisWasteNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A regional landfill at North Ridge Quarry, Berremangra

The proponent proposes to turn the existing North Ridge Quarry pit at 5423 Hume Highway, Berremangra, in the Hilltops council area, into a landfill. It would receive up to 40,000 tonnes a year of general solid waste (putrescible). Waste would be hauled about 3 km from an existing transfer station to the pit, using existing roads and the existing Hume Highway access. The scoping report says there would be 3 operators and no additional permanent buildings. No capital investment is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, and agencies have given advice on them. No dates are given. Next, the proponent prepares the EIS, which is exhibited for public submissions. There are no submissions yet. The department then assesses the project.

Annual waste intake
40,000 tonnes a yearPortal page
Haul distance to the pit
3 kmScoping Report
Operators
3 peopleScoping Report

The department's description

Construction and operation of a landfill at the existing North Ridge Quarry, and to receive up to 40,000 tonnes per annum of General Solid Waste (putrescible).

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.