State significant development

Bookham Wind Farm

A 594 MW wind farm with up to 99 turbines at Bookham

Under way: at prepare eisEnergy: windRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 594 MW wind farm with up to 99 turbines at Bookham

The proponent proposes a wind farm at Bookham, in the Yass Valley Council area, about 30 km west of Yass. It would have up to 99 wind turbines and a total capacity of 594 MW. It would also include a battery energy storage system with a proposed capacity of 200-250 MW / 850-1000 MWh, new transmission works, access roads and temporary construction facilities. No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, with supplementary requirements and advice from many agencies. No submissions have been made yet. Next, the proponent lodges the EIS, which is then exhibited so the public can make submissions. The department then assesses the project and decides it or refers it for decision.

Total capacity
594 MWScoping Report
Maximum wind turbines
99 turbinesScoping Report
Battery power capacity (upper end)
250 MWScoping Report
Battery storage capacity (upper end)
1,000 MWhScoping Report

The department's description

Construction and operation of a wind farm with up to 99 wind turbines, battery storage and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.