Lourdes Killara
Redeveloping Lourdes Retirement Village, 95-97 Stanhope Road, Killara
Where it is in the process
At response to submissions
What it proposes
AI summary. Written from this project's page and its SSD-88004956 Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Redeveloping Lourdes Retirement Village, 95-97 Stanhope Road, Killara
The proponent proposes to redevelop the Lourdes Retirement Village at 95-97 Stanhope Road, Killara, in the Ku-ring-gai council area. It seeks to demolish 172 independent living units and build 145 new ones across nine new blocks, a reduction of 27 dwellings. It would reuse the local heritage item Headfort House, add community facilities, upgrade the residential care facility and subdivide the site. The proponent says most existing buildings are in a high bushfire attack zone. The proposal exceeds the building height limit. No capital investment is stated.
The environmental impact statement (EIS) was prepared in 2026 and exhibited, and the portal lists 57 submissions: 55 objecting, 1 supporting and 1 commenting. The proponent is now responding to the submissions and may amend the project. The department then assesses it with advice from other agencies and prepares a report. The application has not been decided.
- New independent living units
- 145 dwellingsSSD-88004956 Environmental Impact Statement
- Existing independent living units to be demolished
- 172 dwellingsSSD-88004956 Environmental Impact Statement
- Reduction in dwellings
- 27 dwellingsSSD-88004956 Environmental Impact Statement
- Submissions
- 57 submissionsPortal page
- Submissions objecting
- 55 submissionsPortal page
The department's description
Redevelopment of existing seniors housing with new buildings for independent living units and upgrades to the residential care facility.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
57 submissions: 55 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
60 documents in 4 folders, each on the NSW Planning Portal
Request for SEARs1
SEARs1
EIS53
- Appendix AA Bushfire Assessment
- Appendix A_SEARs Compliance Table
- Appendix BB_ACHAR Due Diligence
- Appendix B_Statutory Compliance Table
- Appendix CC_Historical Archaeological Impact Assessment
- Appendix C_Mitigation Measures Table
- Appendix DD Statement of Heritage Impact
- Appendix D_Community Consultation Table
- Appendix E Clause 4.6 Variation - Height
- Appendix EE_Accessibility Capability Statement
- Appendix F Engagement Report
- Appendix FF_EDC Report
- Appendix GG_Civil Engineering Drawings
- Appendix G_Survey Plan
- Appendix HH_Dewatering Management Plan - Part 1
- Appendix HH_Dewatering Management Plan - Part 2
- Appendix HH_Dewatering Management Plan - Part 3
- Appendix H_Draft Subdivision Plan
- Appendix II Clause 4.6 Variation - FSR
- Appendix I_Connecting with Country Framework
- Appendix J_Architectural Drawings - Part 1
- Appendix J_Architectural Drawings - Part 2
- Appendix J_Architectural Drawings - Part 3
- Appendix J_Architectural Drawings - Part 4
- Appendix J_Architectural Drawings - Part 5
- Appendix J_Architectural Drawings - Part 6
- Appendix J_Architectural Drawings - Part 7
- Appendix J_Architectural Drawings - Part 8
- Appendix J_Architectural Drawings - Part 9
- Appendix K_Architectural Design Report - Part 1
- Appendix K_Architectural Design Report - Part 2
- Appendix L_Visual Impact Assessment
- Appendix M Transport Impact Assessment
- Appendix N Noise and Vibration Impact Assessment
- Appendix O_Integrated Water Management Plan
- Appendix P_Geotechnical and Hydrogeological Assessment
- Appendix Q_Preliminary Groundwater Quality Screening
- Appendix R_Preliminary Site Investigation
- Appendix S Targeted Soil Contamination Assessment
- Appendix T_Landscape Plans
- Appendix U_Landscape Report
- Appendix V_Arboricultural Impact Assessment
- Appendix W_ESD Report
- Appendix X_1.1 Stage 1 BASIX Certificate
- Appendix X_1.2 Stage 1 NatHERS Certificate
- Appendix X_2.1 Stage 2 BASIX Certificate
- Appendix X_2.2 Stage 2 NatHERS Certificate
- Appendix X_3.1 Stage 3 BASIX Certificate
- Appendix X_3.2 Stage 3 NatHERS Certificate
- Appendix X_BASIX Report
- Appendix Y_BDAR
- Appendix Z_Waste Management Plan
- SSD-88004956 Environmental Impact Statement
What's near it
Where it is
- Suburb
- Killara
- Council area
- Ku-ring-gai
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.