On the map
State significant development

Residential development with infill affordable housing at 4-8 Highgate Road, Lindfield

A nine-storey, 70-apartment building at Highgate Road, Lindfield

Under way: at prepare eisHomesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Industry Specific SEARs Housing8142279 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A nine-storey, 70-apartment building at Highgate Road, Lindfield

The proponent proposes to demolish existing dwellings at 4, 6 and 8 Highgate Road, Lindfield, in the Ku-ring-gai Council area. It would build a nine-storey residential flat building with 70 apartments, including 15% affordable housing. No capital investment, floor area or job numbers are stated.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) were issued on 10 Sep 2026. They list what the EIS must cover, including built form, solar access and overshadowing, visual impact, transport, noise, flooding, bushfire and the affordable housing provider. No public submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited for public submissions before the department assesses it.

Apartments
70 dwellingsPortal page
Building height
9 storeysPortal page
Affordable housing share
15 per centPortal page

The department's description

Demolition of existing dwellings and construction of a nine-storey residential flat building comprising 70 apartments (including 15% affordable housing.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

3 documents in 2 folders, each on the NSW Planning Portal

Request for SEARs1
SEARs2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.